Similar Projects
North Fire Station - City of Kansas City
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Kansas City, MO 64108

Fire Station 5 Replacement - 828TBD74 - City Of Lees Summit
Demolition, New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Lees Summit, MO 64082

Fire Station 4 Replacement - 75735874 - City Of Lees Summit
Demolition, New Construction, Infrastructure
Design
$7,000,000 CJ est. value
Lees Summit, MO 64064

Morley Street Fire Station / Moberly
New Construction, Infrastructure - 10,000 SF
Design
$1,500,000 CJ est. value
Moberly, MO 65270

Perryville Fire Department Building
Renovation
Post-Bid
$3,000,000 est. value
Perryville, MO 63775

Fire Station #4 Construction
New Construction, Infrastructure
Post-Bid
$5,975,000 CJ est. value
Branson, MO 65616

Police Precinct 1 - St. Louis County - Rebid
New Construction, Infrastructure - 17,224 SF
Results
$9,526,000 CJ est. value
Saint Louis, MO 63103

Police Department Renovations
Renovation
Results
Moscow Mills, MO 63362

Nixa Fire Protection District - New Fire Station #1
New Construction, Infrastructure - 9,430 SF
Construction
$2,965,562 CJ est. value
Nixa, MO 65714

Police Station - City of University City
New Construction, Renovation
Pending Verification
$5,000,000 CJ est. value
University City, MO 63130

St. Louis County Police Station
New Construction
Pending Verification
$5,000,000 CJ est. value
Saint Louis, MO 63103

New Fire Station - Washington
New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Washington, MO 63090

Clark Street Police Station Expansion - City of Moberly
Addition, Demolition, Renovation, Infrastructure - 6,000 SF
Design
$2,300,000 CJ est. value
Moberly, MO 65270

Construction Management Services for The Community Fire Protection District - CFPD House #1, #2, and #3 Renovations
Renovation
Post-Bid
$1,300,000 est. value
Overland, MO

Additions and Renovation to Riverside Public Safety
Renovation, Addition
Results
$700,000 est. value
Riverside, MO 64150

Last Updated 10/17/2023 10:09 AM
Project Title

RFP - Construction Manager at Risk (CMR) for Fire Station 1

Physical Address View project details and contacts
City, State (County) Lees Summit, MO 64063   (Jackson County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Bidding, Construction start expected February 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Question Deadline 10/17/2023 at 12:00 PM CT Question Deadline date changed from 10/13/2023 to 10/17/2023. Questions regarding this RFP shall be submitted by email to: Sharon Bloom (Sharon.bloom@cityofls.net). Preconstruction Services and Activities: Generally, Preconstruction Services will include working collaboratively as part of the Project Team on A) project scope, and B) materials selection, constructability reviews, cost estimating, and schedule input asthe design proceedsfrom concept and schematic design to final construction plans and development ofthe GMP. More specifically, the CMR will be expected to provide the following preconstruction services and activities as part of the Project Team: a. Provide input to the Project Team during project scoping regarding the cost and schedule implications of performing a renovation or demolishing and constructing a new facility on the same site. b. Review and consult regarding the selection of project materials, building systems, and equipment, which shall be compatible and conforming to equipment throughout the City's existing Fire Station facilities. Provide analysis of the project plans, including input regarding constructability and feasibility of proposed conceptual design and schedule, phasing, and sequencing of construction. c. Provide ongoing cost estimating support throughout the design process. d. Develop a phasing plan and overall project schedule, including all activities from design through project completion. e. Provide construction cost cash flow projections. f. Provide ongoing value engineering and constructability reviews, including input regarding means and methods. Conduct a complete constructability and coordination review of the GMP package prior to finalizing the GMP. g. Consult regarding the permits and governmental approvals that will be necessary for the construction of the Project (Permits). h. Obtain required Permits. i. Provide a proposed GMP when the Project Team determines that the drawings and specifications are sufficiently complete The City reserves the right to reject any or all proposals determined to be nonresponsive. Proposals received from debarred orsuspended firms will be rejected. Any proposalthatis notresponsive to all ofthematerial and substantialterms, conditions, and performance requirements ofthe RFPmay be rejected. The City also reservesthe rightto discontinue the selection and/or negotiation process if it determines it is not in the City's best interest, or to refrain from entering into an agreement with any of the responding or interviewed firms. The City is seeking a Construction Manager at Risk ("CMR") to provide preconstruction and construction services for Fire Station 1 located at 207 SE Douglas St, Lee's Summit, MO 64063. The City, the design firm to be selected by the City, and the CMR team (collectively the "Project Team") will coordinate services in order to complete the project design and construction. The City intends to enter into a Cost of Work plus a fixed fee and fixed portions of the general conditions with a Guaranteed Maximum Price (GMP) contractual arrangement with the selected firm. The purpose of this project is to A) determine whether to renovate or replace the existing Fire Station 1; and B) execute the design and construction of the fire station. It is expected the station will house upwards of 17 employees, with associated support spaces. The City is currently selecting an architectural firm for the design of this construction project. The Project Team will work collaboratively to establish a scope of work within the project budget. Delivering the completed project within the project budget is a high priority. All Questions Due October 17, 2023 NoonCST No addenda after October 18, 2023 Selection Committee Meeting Week of October 30, 2023 Firms Notified forOral Interview Week of October 30, 2023 Interviews 50 minutes each Week of November 6, 2023

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents