145th Street East Warehouse and Distribution Development
New Construction, Infrastructure - 830,000 SF
Conception
$89,600,000 CJ est. value
Rosemount, MN 55068

145th Street East Warehouse and Distribution Development
New Construction, Infrastructure - 830,000 SF
Conception
$89,600,000 CJ est. value
Rosemount, MN 55068

Suite Living of Rosemount
New Construction, Infrastructure
Design
$10,300,000 CJ est. value
Rosemount, MN 55068

Aldi #74 / Farmington
New Construction, Infrastructure - 22,245 SF
Design
$3,200,000 CJ est. value
Farmington, MN 55024

Signing, Lighting and Bridge No. 4190
Infrastructure
Bidding
$11,000,000 CJ est. value
Mendota Heights, MN 55120

Floor & Decor / Apple Valley - Rebid
Demolition, New Construction, Infrastructure - 152,916 SF
Bidding
$8,801,000 CJ est. value
Apple Valley, MN 55124

Agricultural Lab Building Infrastructure Improvements
Renovation, Alteration
Post-Bid
$19,126,000 est. value
Saint Paul, MN 55155

New County Library at Marie and 7th Avenues - Dakota County
New Construction, Infrastructure - 16,146 SF
Post-Bid
$6,000,000 CJ est. value
South Saint Paul, MN 55075

Ice Rink and Arena Equipment with Related Supplies and Services
Results

Spring Lake Park Reserve Ravine Stabilization
Infrastructure
Results
Rosemount, MN 55068

Orchard Place Retail Center
Addition - 24,800 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Apple Valley, MN 55124

Biscayne Avenue Winery
New Construction, Infrastructure - 8,000 SF
Construction
$4,300,000 CJ est. value
Rosemount, MN 55068

Vermillion Acres Senior Housing
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Hastings, MN 55033

Amber Fields
New Construction, Infrastructure
Pending Verification
$740,500,000 CJ est. value
Rosemount, MN 55068

Greenway Development: Minnesota River Greenway - Fort Snelling Segment - P00127 - Dakota County
Infrastructure
Conception
$7,425,139 CJ est. value
Eagan, MN 55123

Last Updated 10/31/2022 08:39 AM
Project Title

Lakeville Hasse Arena Outdoor Rink Expansion - Bid Pack 1 and 2

Physical Address View project details and contacts
City, State (County) Lakeville, MN 55044   (Dakota County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Site Development, Stadium
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $6,989,419 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Lakeville Hasse Arena Outdoor Rink Expansion Each sealed envelope containing a Bid must be plainly marked on the outside as Bid for Lakeville Hasse Arena Outdoor Rink Expansion. Each Bid must be accompanied by a Bid Bond payable to the owner for five percent (5%) security of the total amount of the Bid, to be forfeited as liquidated damages in the event that the bid be accepted and the bidder fails to enter promptly into a written contract and furnish the required bond. PROJECT DESCRIPTION Bid Package #1 Upgrade of existing refrigeration system to an ammonia refrigerant with the capacity for two ice rinks. This package will include an alter- nate to provide the outdoor ice sheet. Bid Package #2 Construction of a structural steel open sided structure over the ice sheet. Includes all civil, structural, mechanical, and electrical work to complete the structure. This package will include an alternate to provide the steel structure which covers the ice sheet. Please refer to the project documents for further information. Bids may not be withdrawn or modified within 60 days after Bids are opened. The Owner's intent of award or judgment will be announced within that period. The Owner may make investigations as deemed necessary to determine the qualifications and ability of the Bidders to perform the work. All bidders must comply with the requirements for payment of prevailing wages, responsible contractor and equal employment opportunity statutes. The Owner reserves the right to reject and and all Bids in whole or in part, waive Bidding informalities or irregularities, or to accept the Bid or Bids, which best serves the interests of the Owner. Bidder Acknowledgements: (1) Any prime contractor or subcontractor that does not meet the minimum criteria established for a "responsible contractor" as defined in Minn. Stat. 16C.285, subd. 3, or fails to verify that it meets those criteria is not a responsible contractor and is not eligible to be awarded a construction contract for the Project or perform work on the Project. (2) Responsible contractors shall submit to the City a signed statement under oath by an owner or officer verifying compliance with each of the minimum criteria in Minn. Stat. 16C.285, subd. 3, at the time that it responds to this solicitation document. (3) A prime contractor shall submit to the City, upon request, copies of the signed verifications of compliance from all subcontractors. (4) A false statement under oath verifying compliance with any of the minimum criteria shall make the prime contractor or subcontractor that makes the false statement ineligible to be awarded a construction project and may result in termination of a contract awarded to a prime contractor or subcontractor that submits a false statement.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents