Similar Projects
Home2 Suites by Hilton / Columbia
New Construction, Infrastructure - 50,000 SF
Conception
$27,000,000 CJ est. value
Columbia, MO 65203

Chapel Hill Connector - Perche Creek Trail - 00745 - 1949 - City of Columbia
Infrastructure
Conception
$500,000 CJ est. value
Columbia, MO 65203

Park Shelter for More's Lake at the City of Columbia Municipal Power Plant
Infrastructure
Design
$100,000 CJ est. value
Columbia, MO 65201

Forum Boulevard - Green Meadows to Nifong - 00653 - City of Columbia
Infrastructure
Design
$2,250,000 CJ est. value
Columbia, MO 65203

RFQ Design - Relocate Community Living Center Phase 2, Columbia
New Construction, Infrastructure
Bidding
$13,323,000 CJ est. value
Columbia, MO 65201

ADA Sidewalk Ramp Repairs and Maintenance
Infrastructure
Bidding
$500,000 CJ est. value
Columbia, MO 65201

Medical Science Building Phase 1
Renovation, Infrastructure
Sub-Bidding
$51,000,000 CJ est. value
Columbia, MO 65201

Seal Coat at Various Location
Infrastructure
Sub-Bidding
$5,000,000 CJ est. value
Columbia, MO 65202

Forum Boulevard Improvements
Infrastructure
Post-Bid
$1,345,495 CJ est. value
Columbia, MO 65203

Radio Tower Erection Service - RKB Site
Infrastructure
Post-Bid
$400,000 est. value
Columbia, MO 65203

Rough Site Grading, Parking and Storm Water System Installation
Infrastructure
Results
Columbia, MO

A3 Main Building Stabilization Columbia Environmental Research Center
Renovation
Results
$500,000 to $1,000,000 est. value
Columbia, MO 65201

O'Reilly Auto Parts (CO5) #6643 / Columbia
New Construction, Infrastructure - 6,972 SF
Construction
$1,300,000 CJ est. value
Columbia, MO 65202

RFQ Design - Professional Architectural and Engineering Design Consulting Services
New Construction, Infrastructure
Pending Verification
$67,000,000 CJ est. value
Columbia, MO 65203

Providence South Plaza
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Columbia, MO 65201

Last Updated 08/11/2023 09:43 AM
Project Title

USDA Plant Science Building - University of Missouri - Columbia

Physical Address View project details and contacts
City, State (County) Columbia, MO 65203   (Boone County)
Category(s) Heavy and Highway, Laboratory
Sub-Category(s) Laboratory, Site Development
Contracting Method Competitive Bids
Project Status Seeking Funding, Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $24,800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new Bioscience Laboratory for the University of Missouri-Columbia As of August 11, 2023, per owner, USDA Plant Science building (CP202231 - VL) project is still in planning. No new project has been set up to build the facility at this time.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings, Doors and Frames, Windows, Vents.
Division 09 - Finishes, Tiling, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Institutional Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents