Similar Projects
Erosion Control
Infrastructure
Design
$570,764 CJ est. value
West Harrison, IN 47060

Intersect. Improv. W/ Added Turn Lanes - US 50
Infrastructure
Design
$403,503 CJ est. value
Bonnell, IN 47022

Intersection Improvement With Added Turn Lanes - US 50
Infrastructure
Bidding
$403,503 CJ est. value
Bonnell, IN 47022

Replacement of Bridge 135
Renovation, Infrastructure
Post-Bid
Lawrenceburg, IN

Road Reconstruction
Infrastructure
Post-Bid
$6,651,409 CJ est. value
Bonnell, IN 47022

Abandoned Coal Mine Restoration
Results
$150,000 est. value

Small Structure 121 Replacement
New Construction
Results
$500,000 est. value
IN

Sellersburg Family Scholar House - Ivy Tech Community College
New Construction, Infrastructure
Pending Verification
$1,900,000 CJ est. value
Lawrenceburg, IN 47025

RFP - Construct Single Family Residential Homes
New Construction, Infrastructure
Post-Bid
$30,000 CJ est. value
Aurora, IN 47001

Replace Superstructure
New Construction
Results
IN

Drainage Improvements on Us 50 Near Greendale Plaza Drive
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Greendale, IN 47025

Replacement of Dearborn County Bridge No. 44
Renovation
Results
Aurora, IN

Wastewater Utility - Priority One Projects
Renovation, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Aurora, IN 47001

South Dearborn Community School Corporation New Athletics Building
New Construction, Infrastructure
Results
$5,684,000 CJ est. value
Aurora, IN 47001

Scooter's Coffee / Lawrenceburg
New Construction, Infrastructure - 666 SF
Post-Bid
$50,000 CJ est. value
Lawrenceburg, IN 47025

Last Updated 11/17/2022 10:13 AM
Project Title

Bridge Replacement - Bridge 29

Physical Address View project details and contacts
City, State (County) Aurora, IN 47001   (Dearborn County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

His project consists of the realignment of a portion of old north hogan road and short ridge road and the replacement of dearborn county bridge no. 29. The work includes the removal of the existing two span steel beam bridge on abutments with spans of 14.5 feet and a width of 22 feet. The new bridge will be a 76 foot single span prestressed concrete aashto type 3 I beam bridge on integral end bents with a 24' clear roadway width. There will be ts-1 railings on the bridge, approach guardrail off the bridge and concrete approach slabs. There will be approximately 650 feet of roadwork on old north hogan road. The work will consist of grading, asphalt pavement, side ditches, driveway realignment and relocating the road at the stream. Old north hogan road will be relocated approximately 32 feet east of the existing road at the bridge. The relocation portion will extend approximately 100 feet south of the bridge and 150 feet north of the bridge. On short ridge road there will be 300 feet of road work consisting of grading, asphalt pavement, widening the lanes, side ditches and relocation of the intersection with old north hogan road. The project is located at the intersection of old north hogan road and short ridge road, hogan township, dearborn county, indiana. Bidders must be pre-qualified with INDOT for work type D(a) Highway or Bridge over Water. There is no pre-bid conference scheduled for this project.The Dearborn County Commissioners, reserve the right to accept or reject any bid and to waive any or all formalities. Each bid must be accompanied by a Bid Bond or Certified Check in a sum equal to 5% of the amount of the bid unless otherwise specified, and a completed Non-Collusion Affidavit. Bid prices must be firm for a period of ninety (90) days from the bid opening date. Should a successful bidder withdraw his bid, or fail to execute a satisfactory contract within ten (10) days after notice of acceptance of his bid, the owner may declare the Bid Security forfeited as liquidated damages, not as penalty. The successful bidder shall furnish a Performance and Labor and Materials Payment Bond in an amount equal to one hundred percent (100%) of the contract sum with an approved surety company. Said bond shall remain in full force and effect for a period of one (1) year after date of final acceptance of the work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents