Similar Projects
2020 Trail Maintenance Project
Bidding
West Haven, UT 84405

700 South and 1200 West CDBG Project
Bidding
Marriott-Slaterville, UT 84404

Urban Project with Parking Structure
Post-Bid
Ogden, UT 84401

2020 Sidewalk Spot Repairs City Wide Project
Post-Bid
Less than $500,000 est. value
Ogden, UT 84401

SR-203; 4875 S. 3850 S. Sidewalk, Ogden
Results
Less than $500,000 est. value
UT

Construction of the 400 North Pedestrian Ramp Project
Results
Less than $14,570 est. value
Marriott-Slaterville, UT

Farr West Citywide Sidewalk Project
Construction
Farr West, UT

Parking Structure Demolition and New Construction
Demolition
Post-Bid
Ogden, UT

Bike Lane Work SR-129
Results

Heritage Wall Access, Parking Lot, and New Field Project.
Results
Ogden, UT

Little Rohmer Park Parking Project
Results
Less than $491,059 est. value
Washington Terrace, UT

DFCM Construction - Pre Qualified Paving WSU Misc Parking Lots Asphalt Maintenance
Results
$250,000 est. value
Ogden, UT

1200 West Widening Project
Results
Less than $2,412,125 est. value
Marriott-Slaterville, UT

Roy High School Parking Lot and Drop Off Project
Results
Roy, UT 84067

SR-284; Weber State Preservation High Volume
Results
$500,000 to $1,500,000 est. value
UT

Last Updated 03/27/2019 04:11 PM
Project Title

Playground Concrete and ADA Ramps

Physical Address View project details and contacts
City, State (County) North Ogden, UT 84414   (Weber County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $50,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Create new curb from North Ogden Elementary to new playground area. Install (2) new sections of ADA ramp and rest area from North Ogden Elementary to new playground. Remove (3) 10' - 0" of sections of existing concrete on existing sidewalks. Pour (3) new sections of concrete tying in existing sidewalks with new curved sidewalk around new playground. Tie new ramp into existing ramp by curb cut. Install new curved concrete sidewalk around playground. Install new ramp from curved sidewalk to mulch area. Install (4) 4' - 0" play panels. Regrade topsoil all new sections concrete and sod. Sprinkler moves to be done by North Ogden City. Contractor to coordinate sprinkler fixes with North Ogden City. Old playground equipment removal and disposal by North Ogden City. Installation on new playground equipment to be completed by North Ogden City. Mulch installation will be done by Weber School District.
Details
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents