Similar Projects
Food and Nutrition Services Summer 2022 Freezer/Cooler Replacement and Renovations
Alteration
Bidding
Kennesaw, Mableton, Marietta, GA 30152

Hayes ES Electrical Upgrades
Alteration
Bidding
Kennesaw, GA 30152

Hydraulic Cylinder, Components, Pump Repairs, Hose Fabrication
Post-Bid
Atlanta, GA

HVAC Filtration Systems Upgrades
Post-Bid
Austell, GA 30106

Shallowford Falls Elementary School Kitchen Hood and HVAC Renovations
Results
Less than $303,000 est. value
Marietta, GA 30062

Lassiter/Sprayberry HS HVAC Improvement Chiller Replacement
Results
Less than $1,479,935 est. value
Marietta, GA 30060

HVAC and Mechanical Products
Term Contract
Post-Bid

Addison Elementary Energy Recovery Unit
Addition
Results
Less than $36,388 est. value
Kennesaw, GA 30152

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Addison Elementary VRF Heat Recovery System
Results
Less than $33,370 est. value
Kennesaw, GA 30152

KSU - Building Automation System Upgrades
Alteration
Post-Bid
Kennesaw, GA

Addison Elementary Rooftop Units
Results
Less than $81,715 est. value
Kennesaw, GA 30152

Addison Elementary School HVAC Renovations 2020
Results
Less than $1,005,000 est. value
Marietta, GA 30066

Full Service Monthly Maintenance Contract for HVAC Six (6) Cobb County PARKS Facilities Cobb County PARKS Department
Term Contract
Results
GA

Replace (5) Five HVAC Units with Energy
Results
Atlanta, GA 30312

Reported 10/05/2021 12:00 AM
Project Title

Sodium Hypochlorite and Fluoride Pump Rooms Ventilation

Physical Address View project details and contacts
City, State (County) Marietta, GA 30067   (Cobb County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally consists of the following major items: Remove existing Heating and Ventilating Unit serving the Chloride Storage and replace with new Dedicated Outdoor Air Unit (DOAS). Connect new exhaust ductwork to the discharge of three existing Rectifiers and discharge exhaust outside the building. Provide new exhaust fan, unit heater, make up air louver and exhaust ductwork to the Fluoride Pump Room.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents