Similar Projects
Roads NFSR 100 Surfacing and Stabilization
Infrastructure
Bidding
$250,000 to $500,000 est. value
Gray Mountain, AZ

N6269 Cowsprings Double Chip Seal
Infrastructure
Bidding
Tonalea, AZ

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Route N21(2) - Kaibeto Chapter - Road Maintenance
Infrastructure
Post-Bid
Kaibito, AZ

System Preservation (Restoration/Rehab/Resurface)
Results
Less than $1,900,000 est. value
Cameron, AZ

JOC - Street Maintenance Projects
Results
Sedona, AZ

Antelope Canyon Resort & RV Park
Construction
$2,700,000 est. value
Page, AZ

Regional FFP IDIQ MATOC Roads, Bridges, Construction and Maintenance Sources Sought
Term Contract
Post-Bid
$1,000,000 to $10,000,000 est. value
Flagstaff, Prescott, Rio Verde, AZ - Albuquerque, NM 86301

Shelby Drive Roadway Improvements Project
Results
$1,644,300 est. value
Sedona, AZ 86336

Forest Road Connection Project
Infrastructure
Post-Bid
Sedona, AZ 86351

System Preservation (Restoration/Rehab/Resurface)
Results
$21,000,000 est. value
Flagstaff, AZ 86004

N1012 3.50 Mile to Nanees Dizi, Road Improvement
Infrastructure
Post-Bid
Tuba City, AZ 86045

Guardrail Improvements and Shoulder Widening
Results
$5,400,000 est. value
Pine, AZ 85544

Los Abrigados to Brewer Road Connection Project
Infrastructure
Post-Bid
$150,000 est. value
Sedona, AZ 86336

Coconino Estates Phase II Improvements
Results
Flagstaff, AZ

Last Updated 05/25/2022 04:30 AM
Project Title

Pavement Rehabilitation

Physical Address View project details and contacts
City, State (County) AZ   (Coconino County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,750,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Located In Cochise County On Sr 90 South Of Benson, From Milepost 298 To Milepost 299 And From Milepost 306 To Milepost 307. The Work Consists Of Pavement Rehabilitation. The Work Includes Milling The Existing Asphaltic Concrete And Replacing It With New Asphaltic Concrete And Asphaltic Concrete Friction Course For Northbound Sr 90, Spot Repair By Grading Roadway For Pavement, Pavement Marking And Other Related Work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents