Similar Projects
Fabrication of Coffer Box for Mcclellan-Kerr Arkansas River Navigation
New Construction
Design
$1,000,000 to $5,000,000 est. value
Kerr, AR - Littleton, CO - Broken Arrow, Chouteau, Webbers Falls, OK 74014

Sheriff Reservoir Outlet Works Gate Replacement
Renovation
Bidding
Oak Creek, CO

CM/GC Services Rito Hondo Dam Rehabilitation
Renovation
Bidding
$4,000,000 to $6,000,000 est. value
Creede, CO

RTD Groundwater Treatment Facility Tunnel 16 for the Regional Transportation District
Post-Bid
Denver, CO

Homestake Missouri Tunnel Repairs
Renovation
Post-Bid
Colorado Springs, CO

Goose Pasture Tarn Dam Rehabilitation
Results
Breckenridge, CO 80424

Crystal Creek Dam Improvements Project
Results
Colorado Springs, CO 80947

Grouting and Structural Repair Project
Renovation
Bidding
$5,000,000 to $20,000,000 est. value
Georgetown, CO

Reservoir 8B Project
Renovation
Post-Bid
$500,000 est. value
Parker, CO

Colorado River Connectivity Channel (CRCC)
Results
Berthoud, CO 80513

PKAA, Captain Jack Tunnel Rehabilitation Project
Results
Less than $165,000 est. value
Denver, CO 80203

Hogchute (Aka Carson) Reservoir Dam Modifications Project
Results
Less than $2,900,000 est. value
Grand Junction, CO 81501

Pmaa, 5716, Spring Creek Dam Outlet Rehab Construction
Renovation
Results
Less than $850,000 est. value

Victor Reservoir #2 Outlet Modifications Project
Renovation
Results
Victor, CO 80860

FP-B1 Baldwin Dam Conversion
Infrastructure
Results
$1,560,447 est. value
Castle Rock, CO

Last Updated 05/29/2022 11:21 PM
Project Title

Albion Dam Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Boulder, CO   (Boulder County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $9,870,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Constructed between about 1910 and 1912, the curved concrete gravity dam is on North Boulder Creek and impounds Albion Lake. The dam is under the jurisdiction of Colorado Division of Water Resources, Dam Safety Branch of the State Engineer’s Office (SEO). The SEO lists Albion Dam as a significant hazard dam in the jurisdictional dam dataset. The dam will be rehabilitated to mitigate concrete deterioration, improve the watertightness of the upstream face, and upgrade the spillway and outlet works, thereby extending its useful life for water storage.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents