Similar Projects
Thomas Metcalf School Replacement - Illinois State University
Demolition, New Construction, Infrastructure
Conception
$74,459,972 CJ est. value
Normal, IL 61790

University High School Replacement - Illinois State University
Demolition, New Construction, Infrastructure
Conception
$82,297,800 CJ est. value
Normal, IL 61761

Outbound Charging Station Substation Foundation / Rivian Automotive
New Construction, Infrastructure
Design
$706,965 CJ est. value
Normal, IL 61761

QuikTrip / Bloomington
New Construction, Infrastructure - 8,000 SF
Design
$4,000,000 CJ est. value
Bloomington, IL 61705

FY24 General Sidewalk, Curb and Gutter Replacement Program - Phase 2
Infrastructure
Bidding
$125,000 CJ est. value
Bloomington, IL 61701

FY24 General Sidewalk, Curb and Gutter Replacement Program - Phase 2
Infrastructure
Bidding
$125,000 CJ est. value
Bloomington, IL 61701

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

110,000 Gallon Standpipe Rehabilitation
Infrastructure
Post-Bid
$500,000 CJ est. value
Arrowsmith, IL 61722

2022 Non-MFT Construction Sections
Infrastructure
Results
IL

Cape Seal from Woodford Co. Line to ILL 9 West of Bloomington
Infrastructure
Results
IL

Heartland Community College - Agriculture Complex
New Construction, Infrastructure - 30,322 SF
Construction
$16,300,000 CJ est. value
Normal, IL 61761

Wonsook Kim College of Fine Arts Renovation
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$67,300,000 CJ est. value
Normal, IL 61761

Wonsook Kim College of Fine Arts Renovation
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$67,300,000 CJ est. value
Normal, IL 61761

Constitution Trail Extension - Lafayette Street to Hamilton Road - 40100100-70051 - City of Bloomington
Infrastructure
Conception
$320,000 CJ est. value
Bloomington, IL 61704

Complete Structure Replacement Over Intermittent
Demolition, New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Chenoa, IL 61726

Last Updated 01/05/2024 04:15 PM
Project Title

FY 2024 General Resurfacing - Phase 2

Physical Address View project details and contacts
City, State (County) Bloomington, IL 61701   (McLean County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $225,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Bloomington, incorporated in 1856, is a home rule unit of government under the 1970 Illinois Constitution. The City of Bloomington is located in the heart of Central Illinois, approximately 125 miles southwest of Chicago, 155 miles northeast of St. Louis and 64 miles northeast of Springfield, the State Capital. The City of Bloomington is the County Seat of McLean County, the largest county in Illinois (approximately 762,240 acres). The results of the 2010 Census shows the City now has a population of 76,610 citizens. The economic strength of the City of Bloomington metropolitan area is well diversified with no single dominating industry. Questions Due to City:December 29, 2023, 4:00pm Response from City:January 5, 2024, 3:00pm Misty Shafer Senior Procurement Specialist 115 East Washington St. Suite 403 Legal Bloomington, IL 61701 Email: mshafer@cityblm.org Phone: (309) 434-2330 Anticipated Award Date February 12, 2024 This project consists primarily of the following major work items: A. Approximately 5,405 TON Hot-Mix Asphalt Surface Course, Mix C, N50 B. Approximately 54,510 SQ YD Hot-Mix Asphalt Surface Removal 1-1/2" C. Approximately 60 SQ YD Pavement Patching, 6" (Special) D. Approximately 52 EA Manhole to be Adjusted, Special E. Approximately 34 EA Valve Box to be Adjusted, Special F. Exactly 4 EA Speed Hump (Special).

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents