Similar Projects
2021 TH 71 Utility Improvement
Infrastructure
Bidding
Olivia, MN

Construction of Sanitary Sewer, Water Main, Services, Storm Sewer, and Streets
Infrastructure
Bidding
Chaska, MN 55318

Ground Thawing Services
Term Contract
Post-Bid
Less than $175,000 est. value
Minneapolis, MN

Regional Drinking Water Project Contract D - Water Distribution System
Renovation
Post-Bid
Cloquet, MN 55720

20" Forcemain Replacement
Results
Saint Joseph, MN

Meter Station M228A, Interceptor 7015C, and L35 Repair
Renovation, Addition
Results
Brooklyn Park, Maple Grove, MN 55101

2021 Street and Utility Extension
Infrastructure
Bidding
Saint James, MN

West Bridge Street Reconstruction
Post-Bid
$3,400,000 est. value
Owatonna, MN

Water System Expansion Utility Improvements
Results
Carver, MN 55315

Glacier Way Improvement
Infrastructure
Bidding
$836,103 est. value
Lakeville, MN

2021 Pipe Bursting
Post-Bid
Saint Paul, MN

Ridgedale Drive Watermain Replacement
Results
Minnetonka, MN 55305

300 (Pierz 3rd Avenue) Reconstruction, 2021 CSAH 43 and 39 Reconstruction and Safe Routes to School
Post-Bid
Pierz, MN 56364

Brookdale Park Neighborhood Reconstruction
Results
Less than $5,900,000 est. value
Brooklyn Park, MN 55444

2021 Street Improvements Project
Post-Bid
Maple Lake, MN

Last Updated 07/03/2021 02:31 AM
Project Title

Watermain Loop Crossing I-94 Improvements

Physical Address View project details and contacts
City, State (County) Clearwater, MN   (Wright County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the construction of approximately: 545 Ton Aggregate Surfacing Class 5 585 Lin Ft 12” Pvc Watermain Trenchless 310 Sq Yd Bituminous Patch 3100 Cu Yd Common Top Soil Borrow 585 Lin Ft 24” Hdpe Pipe Casing – Directional Drilled 10950 Sq Yd Hydraulic Matrix, Fertilizer, And Seeding 4670 Lin Ft 12” Pvc Watermain 1 Each Overhead Fill Station

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents