Project Title | Niven Park Playground Improvement Project |
Physical Address | View project details and contacts |
City, State (County) | Larkspur, CA 94904 (Marin County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $600,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Reference Number 0000317646 Question Deadline 10/17/2023 at 5:00 PM PT Question deadline date changed from 09/28/2023 As per Addendum 3 Questions are submitted online Yes Removal of the existing play structure, concrete curbing and wood fiber surfacing materials; installation of new water utility lines and drainage system; grading; installation of new play structures, ornamental features, art sculptures, tables, benches, and drinking fountains; installation of new ADA surfacing for pathways (concrete, DG, etc) and the play areas (synthetic surf, sand, pebbles, wood fiber); installation of short retaining walls and perimeter fencing; installation of landscaping materials, plants, and irrigation systems. Standard vehicular & pedestrian traffic control and erosion control protocols shall be observed. Removal of packing materials and general cleanup of the project area shall be included. Bid Intent Not Available Removal of the existing play structure, concrete curbing and wood fiber surfacing materials; o installation of new water utility lines and drainage system; o grading; o installation of new play structures, ornamental features, art sculptures, tables, benches, drinking fountains, and other site furnishings; o installation of new surfacing for pathways and play areas; o installation of short retaining walls and perimeter fencing; o installation of landscaping materials, plants, and irrigation system; o standard vehicular & pedestrian traffic control and erosion control protocols shall be observed. o cleanup of the project area during and after construction; o All playground furnishings and materials shall be installed in a manner in accordance with current ASTM and CPSC playground safety standards and guidelines; o Any and all other work required to complete project per plans. There will be no mandatory pre-bid conference, however, it is recommended that Contractor visit the site prior to submitting a bid. Questions are submitted online Yes General Requirements - Bid Deposit Required - Certified Payroll - Contractors License Required - Installation Required - Insurance Required - Required Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Labor and Materials Bond 100 % - Defective Materials/Workmanshi 10 % Engineer's Estimate is approx $600,000. The Project commencement date must be no later than November 27, 2023 |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |