Similar Projects
Strawberry Point Elementary School - 2022 Measure G School Bond Priority 1 Projects - Mill Valley School District
Renovation, Infrastructure
Conception
$4,616,497 est. value
Mill Valley, CA 94941

Old Mill Elementary School - 2022 Measure G School Bond Priority 1 Projects - Mill Valley School District
Renovation
Conception
$3,604,965 est. value
Mill Valley, CA 94941

North Bay Children’s Center facilities
Demolition, New Construction, Infrastructure - 32,339 SF
Design
$9,200,000 CJ est. value
Novato, CA 94949

San Rafael Inn
Demolition, New Construction, Infrastructure - 44,485 SF
Design
$9,630,000 CJ est. value
San Rafael, CA 94901

The Neighborhood at Los Gamos
New Construction, Infrastructure - 5,500 SF
Post-Bid
$69,000,000 CJ est. value
San Rafael, CA 94903

RFP Engineering - Hart Street Connector
Infrastructure
Post-Bid
$125,000 to $150,000 est. value
Corte Madera, CA 94925

E Blithedale Pipeline Replacement
Alteration
Results
$2,200,000 est. value
Corte Madera, CA

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Vivian Street Multi-Residential / San Rafael
New Construction, Infrastructure
Pending Verification
$26,000,000 CJ est. value
San Rafael, CA 94901

Vivian Street Multi-Residential / San Rafael
New Construction, Infrastructure
Pending Verification
$26,000,000 CJ est. value
San Rafael, CA 94901

Corte Madera Creek Flood Management Project - Zone 9 - Marin County
Infrastructure
Conception
$9,750,000 CJ est. value
San Rafael, CA 94901

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

Rehabilitate Fort Cronkhite Barracks 1057 Golden Gate National Recreation Area
New Construction, Renovation
Post-Bid
$1,000,000 to $2,000,000 est. value
Sausalito, CA

Place Polyester Concrete Overlay, Place HMA, Cold Plane AC Pavement
Infrastructure
Results
$2,540,000 est. value
CA

Aldersly Retirement Community Redevelopment
Demolition, New Construction, Renovation, Infrastructure
Pending Verification
$20,000,000 CJ est. value
San Rafael, CA 94901

Last Updated 10/10/2023 03:16 PM
Project Title

Niven Park Playground Improvement Project

Physical Address View project details and contacts
City, State (County) Larkspur, CA 94904   (Marin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000317646 Question Deadline 10/17/2023 at 5:00 PM PT Question deadline date changed from 09/28/2023 As per Addendum 3 Questions are submitted online Yes Removal of the existing play structure, concrete curbing and wood fiber surfacing materials; installation of new water utility lines and drainage system; grading; installation of new play structures, ornamental features, art sculptures, tables, benches, and drinking fountains; installation of new ADA surfacing for pathways (concrete, DG, etc) and the play areas (synthetic surf, sand, pebbles, wood fiber); installation of short retaining walls and perimeter fencing; installation of landscaping materials, plants, and irrigation systems. Standard vehicular & pedestrian traffic control and erosion control protocols shall be observed. Removal of packing materials and general cleanup of the project area shall be included. Bid Intent Not Available Removal of the existing play structure, concrete curbing and wood fiber surfacing materials; o installation of new water utility lines and drainage system; o grading; o installation of new play structures, ornamental features, art sculptures, tables, benches, drinking fountains, and other site furnishings; o installation of new surfacing for pathways and play areas; o installation of short retaining walls and perimeter fencing; o installation of landscaping materials, plants, and irrigation system; o standard vehicular & pedestrian traffic control and erosion control protocols shall be observed. o cleanup of the project area during and after construction; o All playground furnishings and materials shall be installed in a manner in accordance with current ASTM and CPSC playground safety standards and guidelines; o Any and all other work required to complete project per plans. There will be no mandatory pre-bid conference, however, it is recommended that Contractor visit the site prior to submitting a bid. Questions are submitted online Yes General Requirements - Bid Deposit Required - Certified Payroll - Contractors License Required - Installation Required - Insurance Required - Required Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Labor and Materials Bond 100 % - Defective Materials/Workmanshi 10 % Engineer's Estimate is approx $600,000. The Project commencement date must be no later than November 27, 2023

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents