Reported | 07/14/2022 12:00 AM |
Project Title | Step Up Transformer |
Physical Address | View project details and contacts |
City, State (County) | Huntsville, AL 35801 (Madison County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs), Construction Start Expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This power transformer will be used in an outdoor substation and will be fed from an impedance grounded Wye overhead 46 kV circuit. The incoming high side of the transformer will be delta connected to the 46 kV system. The outgoing low side of the power transformer will be connected into a 4-wire, 3- phase, 24.94/14.4 or 12.47/7.2 kV, grounded Wye, overhead utility electrical system. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |