Similar Projects
Zoom Classroom Equipment
Alteration
Post-Bid
Elgin, IL 60123

Cooler, Freezer, Blast Freezer, and a Char Broiler for the Culinary Program
Alteration
Post-Bid
Elgin, IL

Walk Thru Metal Detectors (WTMD)
Results

Wilder Park Improvements
Infrastructure
Results
Less than $447,080 est. value
Aurora, IL 60506

Grounds Supplies and Equipment District Wide
Alteration
Post-Bid
Algonquin, IL

School Kitchen Equipment
Alteration
Results
Aurora, IL

Food Service Equipment Repair
Term Contract
Post-Bid
Algonquin, IL

PAV HA 6th Floor Lab - RO System Upgrade BP-02 (GC)
Alteration
Results
Lexington, KY 40506

Sewage Grinder Cutting Head Replacement
Alteration
Post-Bid
West Dundee, IL

New Laundry Outlet Boxes
Infrastructure
Results
Aurora, IL 60505

CTE Equipment for Dundee-Crown High School
Alteration
Post-Bid
Carpentersville, IL 60110

LED Lighting for Hemmens Cultural Center
Term Contract
Results
Elgin, IL 60120

6 Ton Bard Unit
Alteration
Post-Bid
Geneva, IL

Keyless Access Control System, and Related Equipment
Alteration
Results
East Dundee, IL

Portable Toilets
Term Contract
Post-Bid
Aurora, IL 60505

Last Updated 08/24/2022 02:05 PM
Project Title

Main Pump Station - Pump No. 4 Replacement

Physical Address View project details and contacts
City, State (County) Aurora, IL 60505   (Kane County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $65,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project site is located inside the existing City of Aurora, Main Pump Station; 1110 Aurora Ave., Aurora, IL 60505. Bid proposals received after the closing time and date shall be rejected. Questions will be answered via addendum and posted to the City's website by 4:00 p.m. CDT, Wednesday, August 10, 2022. NO questions will be accepted or answered verbally. No questions will be accepted after the August 3, 2022, cut-off date/time. It is the Bidder's responsibility to check the noted website before submitting their Bid Proposal. Bidders are required to meet the requirements in the Instructions to Bidders. All bids must comply with the Illinois Prevailing Wage Act; and the Prevailing Rate of Hourly Wages in the City of Aurora shall be paid to all persons on the project. The City of Aurora has a local preference ordinance that would apply to this contract. The City of Aurora encourages minority business firms to submit bids and encourages the successful firm to utilize minority businesses as applicable. Any Bidder who owes the City money may be disqualified at the City's discretion. The City of Aurora reserves the right at any time and for any reason to cancel this Invitation to Bid, to accept or reject any or all Bids or portion thereof or accept an alternate bid. The City reserves the right to waive any immaterial defect in any bid, or technicality, informality, or irregularity in the bids received, and to disregard all nonconforming or conditional bids or counter-proposals. The City reserves the right to hold the best bids for ninety (90) days from the opening date set forth above. The City may seek clarification from any bidder at any time and failure to respond promptly is cause for rejection. The City further reserves the right to award the bid to the lowest responsible Bidder whose offer best responds in quality, fitness, and capacity to the requirements of the proposed work or usage and therefore is in the best interest of the City.

Details

Division 11 - Equipment, Operation and Maintenance of Equipment, Vehicle Service Equipment, Maintenance Equipment, Unit Kitchens, Residential Equipment, Residential Appliances, Agricultural Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents