Similar Projects
Timber Bluffs Acres Phase I and II
New Construction
Conception
Eau Claire, WI 54701

Cummins Distribution Facility
New Construction - 342,000 SF
Conception
$20,000,000 est. value
Platteville, WI 53818

Mygrant Glass Industrial
New Construction - 121,950 SF
Design
Oak Creek, WI

Ryan Business Park Industrial Developments
New Construction - 191,400 SF
Design
CJ est. value
Oak Creek, WI 53154

Cannonball Path Phase 6
Infrastructure
Bidding
$730,000 CJ est. value
Madison, WI 53715

Safe Streets Madison 2022 - Group 2
Infrastructure
Bidding
$700,000 CJ est. value
Madison, WI 53715

Century Drive Townhouses
New Construction - 73,680 SF
Post-Bid
Wautoma, WI 54982

Portillos
Alteration
Post-Bid
Madison, WI 53719

Mold Abatement and Site Restoration Services
Term Contract
Results
Madison, WI

Grassed Waterway System & Wetland Restoration
Results
Germantown, WI

Automated Food Warehouse & Fulfillment Center
New Construction - 330,000 SF
Construction
$10,000,000 CJ est. value
Pleasant Prairie, WI

Class A Industrial Building
New Construction - 756,728 SF
Construction
$46,000,000 est. value
Kenosha, WI 53144

Storage Building
New Construction - 11,520 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Wisconsin Rapids, WI 54494

Spec Building
New Construction - 757,418 SF
Pending Verification
$45,000,000 est. value
Kenosha, WI 53144

Industrial Warehouses
Build-Out - 1,854,208 SF
Conception
WI

Last Updated 08/31/2022 12:02 PM
Project Title

Salt Structure and Bin Storage

Physical Address View project details and contacts
City, State (County) Weston, WI 54476   (Marathon County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of three salt structure options for bidding. Bid Option #01 to include the construction of a new salt structure. The structure is to contain concrete retaining walls with a wood truss roof framing system. Bid Option #2 to include the construction of a new salt structure. The structure is to contain timber columns and wood framed construction. Bid Option #03 to include the disassembling of the existing salt structure (located at the existing Village Hall) and reassembling at the new site. In addition, the bid is to include construction of the lean-to style bin storage building Bids will be based on a single lump sum for the following separate Contracts: 1. General Bidders may be required to submit a brief statement of their qualifications to the Architect before submitting a Bid. All Bidders will be required to submit a complete list of subcontractors with their proposals. within 24 hours after bid due date. All Bids will remain firm for a period of 90 days after the opening date. A certified check or a satisfactory Bid Bond executed by the Bidder and satisfactory Surety Company in the amount of 10% of the Bid made payable to The Village of Weston, shall accompany each bid. Successful Bidders will be required to furnish and pay for a satisfactory Performance Bond, and Labor and Materials Bond in the amount of 100% of the Contract. The Owner reserves the right to accept or reject any and all Bids in their best interest.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents