Similar Projects
New K-5
Conception
FL

Pinecrest Academy Gymnasium
New Construction, Addition - 12,651 SF
Conception
Miami, FL 33185

Miami Produce Center
New Construction - 1,356,000 SF
Design
Miami, FL

Carrollton Boys School
New Construction - 66,602 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Miami, FL

South Pointe Elementary School Addition and Renovations
Renovation, Addition
Bidding
Miami Beach, FL 33139

North Glade Elementary School Physical Education Shelter and Renovations
Renovation
Bidding
Opa-locka, FL 33055

Parkview Elementary School
Sub-Bidding
Miami Gardens, FL 33056

Dr. Gilbert Porter Elementary School
Sub-Bidding
Miami, FL 33196

George Washington Carver Middle School Renovations
Post-Bid
Less than $2,799,203 est. value
Coral Gables, FL 33133

Joella C. Good Elementary School Renovations
Renovation - 93,863 SF
Post-Bid
Less than $3,136,235 est. value
Hialeah, FL 33015

Shenandoah Middle School New Addition & Renovations
Results
Miami, FL 33145

Renovations at Glades Middle School
Renovation
Results
Less than $4,798,172 est. value
Miami, FL 33173

Palmer Trinity School - Classroom Building
New Construction - 2,100 SF
Construction
$500,000 to $1,000,000 CJ est. value
Palmetto Bay, FL

Temple Beth Am - Classroom Building
New Construction - 8,200 SF
Construction
Pinecrest, FL

Christopher Columbus High School
New Construction
Conception
Miami, FL 33165

Last Updated 03/05/2021 09:11 AM
Project Title

MA Milam K-8 Center (Phase 1) - Renovations & PE Shelter Replacement

Physical Address View project details and contacts
City, State (County) Hialeah, FL 33012   (Miami-Dade County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,143,452
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents