Similar Projects
Ingersoll Rand Compressed Air System Purchase and Install
Bidding

Ingersoll Rand Compressed Air System Purchase and Install
Bidding

Parks and Recreation Building HVAC Upgrades
Post-Bid
Less than $497,592 est. value
Salt Lake City, UT 84104

Brigham City 10, 16 Wards Hvac
Renovation
Post-Bid
Brigham City, UT

Weatherization Program
Results
Price, UT

S--PAO & PGMB Facility Maintenance
Results
Pleasant Grove, UT

HVAC Maintenance Services
Post-Bid
Salt Lake City, UT 84119

Hoods and Ducts
Results
Ogden, UT 84056

Wall Mounted HVAC for Portable Classrooms
Term Contract
Post-Bid
Salt Lake City, UT 84070

Housing Maintenance Services
Term Contract
Results
Fort Duchesne, UT 84026

Uintah High School Kitchen Hood System Replacement
Term Contract
Post-Bid
Vernal, UT 84078

DFCM Construction-Pre Qualified Mechanical-DOC/CUCF Mechanical Room New Chiller/Cooling Tower
Results
Less than $1,000,000 est. value
Gunnison, UT 84634

York OEM HVAC Parts and Equipment
Term Contract
Post-Bid
Salt Lake City, UT 84190

HVAC
Results
Logan, UT 84322

Canyonlands Field Airport Upgrade to Terminal Building Roof Top Units
Post-Bid
Moab, UT 84532

Last Updated 03/05/2020 01:16 PM
Project Title

Installation of Roof Top Unit for ARl Middle School

Physical Address View project details and contacts
City, State (County) Blanding, UT   (San Juan County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide and install a 12.5 ton rooftop air handling unit on the cafeteria; heat and cool Provide and install new ductwork throughout the cafeteria Provide and install new grills, registers, diffusers and louvers Install I-vu Webserver for building DDC and tie unit into fire alarm system New unit is to be frame mounted and supported by adjacent bearing wall Supply and return air ducts shall be accessed through side light windows Vendor to supply all electrical, mechanical and plumbing as needed Vendor to supply portable toilets for their employees Vendor to coordinate boom lift Vendor is responsible for all roof membrane penetrations and ensuring the interior of the school remains dry for the duration of the project Vendor is responsible for final roof membrane dry in Patch and paint as needed.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents