Similar Projects
Last Updated | 04/08/2020 11:02 AM |
Project Title | Radiant Floor Heat Repairs at the Clinton County Correctional Facility |
Physical Address | View project details and contacts |
City, State (County) | Lock Haven, PA 17745 (Clinton County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $18,151 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The contractor is to furnish labor, materials and equipment required to completely install new radiant zone controls and associated piping for 2 mechanical accesses. Installation shall match existing upgrades to the 2 accesses currently in place. Each mechanical access supplies heat to two (2) housing unit cells. These zones are to be independent of the boiler and be a sealed loop (meaning that fluids from these zones cannot flow freely back into the main boiler). All materials and parts must be new. Proposal must include a full product list including manufacturer specifications. All list of tools and equipment must be provided and preapproved prior to entering the facility. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |