Similar Projects
Marine Way Seawall and Promenade Construction - 17-047 - City of Delray Beach
Infrastructure
Conception
$9,300,000 est. value
Gulf Stream, FL 33483

Rebuild Emergency Overflow Blount Island Marine Terminal
Infrastructure
Bidding
$7,250,000 est. value
Jacksonville, FL 32226

Replacement Pontoon Boat Dock at the Environmental Learning Center
Infrastructure
Bidding
$200,000 est. value
Vero Beach, FL 32963

Florida Department of Environmental Protection Perdido Key State Park Building and Structural Repairs
Renovation
Sub-Bidding
$1,000,000 est. value
Pensacola, FL 32598

CT5 Mooring Improvements
Post-Bid
$2,000,000 est. value
Cape Canaveral, FL 32920

Fishing Piers, Rebuild With Forever Plastic Materials
Infrastructure
Post-Bid
Port Saint Lucie, FL

Rebuild UPH STA Ponce de Leon Inlet, New Smyrna Beach, FL
Results
$100,000 to $6,000,000 est. value
New Smyrna Beach, FL 32168

Wharf and Wall Repairs
Results
$1,677,491 est. value
Palmetto, FL 34221

Tribute by Marriott
New Construction
Construction
$12,000,000 est. value
Saint Augustine, FL 32080

Latitude Margaritaville Watersound Amenities, Phase 1 & 2
New Construction - 34,862 SF
Construction
$30,000,000 est. value
WaterSound, FL

Major M&R Waterfront Repairs
Term Contract
Post-Bid
$1,000,000 to $4,000,000 est. value
Marathon, FL 33050

Construction Management at Risk Services for Kingfish Boat Ramp Improvements
Results
Less than $4,500,000 est. value
Holmes Beach, FL 34217

Skiff Point
New Construction
Construction
Clearwater, FL 33767

Construction of The New Boardwalk and Dock at The St. Petersburg College Campus in Bay Pines
Infrastructure, Alteration
Post-Bid
Madeira Beach, FL 33708

Mexico Beach Inlet Sand Bypassing and Beach Restoration
Results
Less than $397,510 est. value
Mexico Beach, FL 32410

Last Updated 07/08/2022 08:49 AM
Project Title

Boathouse & Bulkhead Replacement

Physical Address View project details and contacts
City, State (County) FL   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work the following: 1. Demolition: Removal of all existing boat house and bulkhead items, including but not limited to roof trusses, floor and roof beams, roofing, decking, and guardrails, floating dock gangway, precast cabled boat ramp, and pilings as well as all associated items. Piles may be cut off below scour elevation if it does not interfere with installation of new pilings. 2. Reconstruction: Reconstruction of a boat house and ramp with approximate area of 2000 square feet supported on driven timber pilings. The new boat house shall have aluminum or stainless-steel grating and guardrails and be framed with wood members at the roof and floor structure. The roof shall be comprised of high wind rated asphalt architectural shingles on a plywood deck supported by trusses. In addition, a prefabricated floating dock will be installed adjacent to the pier for visitor access. The precast cabled boat ramp shall also be reinstalled.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents