Similar Projects
The Springs Motel Redevelopment
Demolition, New Construction, Infrastructure - 15,330 SF
Conception
$9,500,000 CJ est. value
Saratoga Springs, NY 12866

Kaydeross Springs
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Saratoga Springs, NY 12866

One-Four-Six Marketplace
New Construction, Infrastructure - 151,000 SF
Design
$140,000,000 CJ est. value
Halfmoon, NY 12118

Agrochem Chemical Plant Expansion / Saratoga Springs
Addition, Demolition, Infrastructure - 24,150 SF
Design
$6,400,000 CJ est. value
Saratoga Springs, NY 12866

Repair and Improvement of the Access Ramp
Infrastructure
Bidding
$1,030,000 CJ est. value
Round Lake, NY 12151

Alterations, Renovations and Improvements to the Burnt Hills-ballston Lake Central School District School Buildings and Associated Facilities
Renovation, Infrastructure
Bidding
$53,938,109 CJ est. value
Ballston, NY 12027

Town Water Service Meter Improvements
Infrastructure
Post-Bid
$400,000 CJ est. value
Corinth, NY 12822

Turf and Spa Motel
Demolition, New Construction, Infrastructure - 100,280 SF
Post-Bid
$31,000,000 CJ est. value
Saratoga Springs, NY 12866

Charlton Fire District - New Fire Station - Electrical Contract (EC)
New Construction, Infrastructure
Results
$317,900 CJ est. value
Ballston Lake, NY 12019

Main Campus and Building Reconstruction - Phase 2A - Electrical
Demolition, New Construction, Infrastructure
Results
$739,200 CJ est. value
Waterford, NY 12188

Tait Lane Reserve
New Construction, Infrastructure
Construction
$80,000,000 CJ est. value
Saratoga Springs, NY 12866

Summit At Halfmoon
New Construction, Infrastructure
Construction
$26,000,000 CJ est. value
Halfmoon, NY 12065

RFP Design - Proposed Firehouse #3
New Construction, Infrastructure
Pending Verification
$6,600,000 CJ est. value
Saratoga Springs, NY 12866

Chick-fil-A / Clifton Park
Demolition, New Construction, Infrastructure - 14,000 SF
Pending Verification
$1,000,000 CJ est. value
Clifton Park, NY 12065

Route 50 Senior Living Community / Wilton
New Construction, Infrastructure - 77,300 SF
Conception
$40,000,000 CJ est. value
Saratoga Springs, NY 12866

Last Updated 02/13/2024 02:01 PM
Project Title

Blue Barns Solar Development

Physical Address View project details and contacts
City, State (County) Ballston, NY 12027   (Saratoga County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Power Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 3.5 MW-AC solar farm. The project will consist of about 237 free-standing tracking solar tables. As of February 9, 2024, this project received approvals from the Clifton Park Planning Board on January 9, 2024. Information regarding a general contractor has not been disclosed. A firm construction timeline has not been confirmed. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents