Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Constructing the Bridge Replacements Grading, Drainage, Pavement, and Bridge
New Construction, Infrastructure
Results
$7,317,335 to $8,943,410 est. value
AL

Constructing the Safety Improvements (Roadway Lighting Installation) on Sr-8 (Us-80) at the Westrock Paper Mill Entrances
Infrastructure
Results
$612,765 to $748,935 est. value
AL

Shore Side Detachment Sewage Lift Pump and Pipe Repair
Infrastructure
Post-Bid
$400,000 CJ est. value
Demopolis, AL 36732

Constructing the Micro-Milling, Resurfacing Scrub Seal, and Traffic Stripe on SR-10 From 0.290 Mile West of the Junction of SR-69 to the Junction of 3rd Street
Infrastructure
Results
$2,362,413 to $2,887,394 est. value
Sweet Water, AL

A New Baseball Dugout For Demopolis High School For The Demopolis City Board Of Education
Infrastructure
Post-Bid
Demopolis, AL 36732

Constructing the Safety Widening, Micro-milling, Resurfacing (Scrub Seal), and Traffic Stripe on SR-13 (Us-43) From 0.800 Mile North of the Junction of CR-47
Infrastructure
Results
$1,781,913 to $2,177,893 est. value
AL

Alabama Department of Public Health Southwestern District Facility Improvements
New Construction, Infrastructure, Renovation
Post-Bid
$1,800,000 CJ est. value
Linden, AL 36748

Constructing the Micro-Milling, Resurfacing (Scrub Seal), and Traffic Stripe on SR-13 (US- 43) from the Junction of 12 Link Road to the junction SR-8 (US-80) in Demopolis
Infrastructure
Results
$1,969,750 to $2,407,472 est. value
AL

Constructing the Grading, Drainage, Pavement, and Bridge on SR-303 (Linden Bypass) from 1.140 miles south of the junction of SR-13 (US-43) and SR-69 to the Junction of SR-28 in Linden
New Construction, Infrastructure
Results
$49,214,240 to $60,150,737 est. value
AL

Constructing the Grading, Drainage, Pavement, and Bridge on SR-303 (Linden Bypass)
Infrastructure
Results
$83,563,215 CJ est. value
Linden, AL 36748

Last Updated 11/18/2022 11:14 AM
Project Title

2020 CDBG Roadway Improvements

Physical Address View project details and contacts
City, State (County) Linden, AL 36748   (Marengo County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,131,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of: Full Depth Reclamation, AKG Surface Treatment and Minor Drainage Improvements at various locations throughout the county. Information concerning the project may be found online. The CONTRACT DOCUMENTS AND PLANS may be examined at Marengo County Commission in Linden AL; and at the office of Goodwyn Mills Cawood. No partial sets, individual pages or drawing sheets will be provided. No documents will be issued within 48 hours prior to bid opening. All bidders must comply with the President's Executive Order Number 11246 which prohibits discrimination in employment regarding race, creed, color, sex or national origin. All bidders must comply with title VI of the Civil Rights Act of 1964, the Davis-Bacon Act, the Anti-Kickback Act and the Contract Workhours Act. The attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the Contract, Section 3, Segregated Facilities, Section 109 and E.O. 11246. The Owner reserves the right to waive any informalities, or to reject any or all bids, and to award the contract to the lowest, most responsive and responsible bidder. All bidders must comply with requirements of the Contractor's Licensing Law of the State of Alabama and be certified for the type of work on which the proposal is submitted. Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Information for Bidders. Registration in SAM (System for Award Management) is required to participate in ADECA projects and other Federal funding programs. All Contractors preparing Bids for the referenced project shall submit a list of similar projects "successfully completed" in the last 5 years, having the same scope of work with construction cost similar to or greater than this project. All nonresident contractors preparing bids shall submit with the bid documents evidence of a current Alabama General Contractor's License, evidence (with original seal of the State of Alabama) of proper registration with the Alabama Secretary of State as a foreign corporation, and a Certificate of Good Standing as a Foreign Corporation from the State of Alabama Department of Revenue. Bids submitted by a nonresident contractor without these documents included will be rejected. Guarantee will be required with each bid for at least 5% of the amount of the bid filed in the form of a certified check, Bid Bond, or irrevocable Letter of Credit acceptable to the owner payable to the Marengo County Commission. Bid Bonds shall include certification that the bonding company is listed in Circular 570 of the U.S. Treasury Department. The name, address, telephone number, and contact person for the bonding company shall also be included. No bidder may withdraw his bid within 60 days after the opening thereof. Bids may be held by the Owner for a period not to exceed sixty (60) days from the date of opening of bids for the purpose of reviewing the bids and investigating the qualifications of the bidders prior to awarding the contract. This project is being funded in part by CDBG Project No.: CY-CM-PF-19-002. The successful bidder will be required to submit 100% performance and payment bonds or an irrevocable "Letter of Credit" which is acceptable to the Owner. All bonds and letters of credit shall be for 100% of the contract price. Attention of Bidders is called to the license required by Title 34, Chapter 8, of the code of Alabama, 1975, and amendments thereto, relating to the licensing of General Contractors. No bid will be accepted from anyone, except a qualified Contractor, licensed by the State Licensing Board for General Contractors, unless otherwise required by the State Licensing Board. All bids shall be submitted in a sealed envelope bearing on the outside the name of the Bidder, Bidder's license number, license expiration date, category, address and name of the project. Envelopes containing bids must be addressed as follows, and delivered to Terry Hinton, Chairman, 101 E. Coats Avenue Linden, AL 36748: BID FOR, "MARENGO COUNTY 2020 CDBG ROADWAY IMPROVEMENTS CDBG PROJECT NO.: CY-CM-PF-19-002". The Marengo County Commission is an equal opportunity employer and encourages the participation of women and minority owned businesses (OMBEs) and Section 3 qualified contractors in all project contract procurements.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents