Reported | 07/15/2022 12:00 AM |
Project Title | Monitoring Wells for Columbia Slope Storm water |
Physical Address | View project details and contacts |
City, State (County) | Vancouver, WA (Clark County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Pumps and Wells |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Contractor shall provide all labor, tools, appliances, materials, and equipment for all work to drill and install up to 27 resource protection (monitoring) wells using hollow stem auger methods as part of the Columbia Slope Stormwater Retrofit Study. Drilling will be performed at 10 sites. The scope of work includes decommissioning each borehole and/or well. Borehole decommissioning will occur immediately after drilling based on drilling observations (i.e., for borings where subsurface conditions are deemed "unfavorable" by the hydrogeologist). In addition, at the discretion of the City, the installed monitoring wells will be decommissioned during a second mobilization at the end of the project (anticipated to be 5 to 18 months following well installation). Monitoring well decommissioning shall be completed within 10 Working Days of notification to decommission monitoring well. |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |