Similar Projects
CHRL Pump Station 1A, 2 and 3
Infrastructure
Design
$630,000 est. value
WA

Sources Sought Pump Replacement NRM CON-687-22-122 Well 1 and Well 2
Infrastructure
Design
$500,000 est. value
Walla Walla, WA 99362

Gossom On-site Septic System Installation
Infrastructure
Bidding
$25,000 to $100,000 est. value
Sedro-Woolley, WA 98284

Norman Road Well Drilling Project
Infrastructure
Bidding
$20,000 to $30,000 est. value
Lopez Island, WA 98261

Tapteal 1 Pump Station Upgrade
Infrastructure
Post-Bid
Richland, WA 99352

Condensate Pump 1 Alpha Refurbishment
Alteration
Post-Bid
Richland, WA

Water Station 5 Reservoirs and Pump Station
Infrastructure
Results
$28,250,000 est. value
Vancouver, WA 98687

Gooseberry Point Wastewater Treatment Plant Improvements
New Construction, Renovation, Infrastructure
Results
$13,000,000 to $14,500,000 est. value
Bellingham, WA 98226

Rehabilitate Unit 5 Trashracks at the Wells Hydroelectric Project
Infrastructure
Bidding
$1,600,000 est. value
East Wenatchee, WA

Kayak Well Rehabilitation
Infrastructure
Post-Bid
$90,000 est. value
Stanwood, WA 98292

Well No. 6
Alteration
Results
$2,189,000 est. value
College Place, WA 99324

Milling Machine Addition for the Wells Hydroelectric Project
Infrastructure
Bidding
$200,000 est. value
East Wenatchee, WA

Hanford Integrated Tank Disposition Contract
Alteration
Post-Bid
WA

Aurora 1160 Series Pump Refurbishment
Alteration
Results
Keyport, WA 98345

Installation of a Tank and Fire Pump to Build
Infrastructure
Post-Bid
Pasco, WA

Reported 07/15/2022 12:00 AM
Project Title

Monitoring Wells for Columbia Slope Storm water

Physical Address View project details and contacts
City, State (County) Vancouver, WA   (Clark County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall provide all labor, tools, appliances, materials, and equipment for all work to drill and install up to 27 resource protection (monitoring) wells using hollow stem auger methods as part of the Columbia Slope Stormwater Retrofit Study. Drilling will be performed at 10 sites. The scope of work includes decommissioning each borehole and/or well. Borehole decommissioning will occur immediately after drilling based on drilling observations (i.e., for borings where subsurface conditions are deemed "unfavorable" by the hydrogeologist). In addition, at the discretion of the City, the installed monitoring wells will be decommissioned during a second mobilization at the end of the project (anticipated to be 5 to 18 months following well installation). Monitoring well decommissioning shall be completed within 10 Working Days of notification to decommission monitoring well.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents