Last Updated | 10/19/2022 09:44 AM |
Project Title | RFP D/B - SR 2014 Corridor Improvement |
Physical Address | View project details and contacts |
City, State (County) | Wyomissing, PA 19610 (Berks County) |
Category(s) | Heavy and Highway, Outdoor Lighting |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Construction Commenced, Construction start expected September 2022 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $2,644,573 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of October 19, 2022, construction is underway. A timeline for completion has not been confirmed. This Partial Design/Build project involves corridor improvements to the entire length of State Route 2014 (Spring Street) from Centre Avenue (State Route 61) to 13th Street in the City of Reading, Berks County. This project will upgrade traffic signals to provide higher visibility by adding larger signal heads, brighter illumination with LED modules, and additional signal heads over travel lanes with protected phasing where needed. Signal Coordination using new controller equipment will reduce congestion and improve safety through radio interconnection. Ten existing signals either have small heads, are dim or are poorly positioned on old supporting equipment. State Route 2014 (Spring Street) from Centre Avenue (State Route 61) to 13th Street in the City of Reading, Berks County. at segment 0010 offset 0000/ segment 0030 offset 2310 Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 0.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: MISCELLANEOUS 408 Version: 2020-4 PennDOT - RFP D/B - SR 2014 Corridor Improvement *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |