Similar Projects
West End Regional Pond & Trunk Oversizing - CIP - STORM-18-007 - City Of Shakopee
Infrastructure
Conception
$400,000 CJ est. value
Shakopee, MN 55379

CIP - Blue Lake Channel (East) Regional Storm Pond - Storm-21-002 - City of Shakopee
Infrastructure
Conception
$675,000 CJ est. value
Shakopee, MN 55379

Canterbury Crossing Senior Housing
New Construction - 25,850 SF
Design
$500,000 to $1,000,000 CJ est. value
Shakopee, MN 55379

Jefferson Court
New Construction
Design
Shakopee, MN 55379

ISD #720 Shakopee High School and Middle School Tennis Court Resurfacing
Infrastructure
Bidding
$60,000 CJ est. value
Shakopee, MN 55379

2023 Street and Utility Improvement Project
Infrastructure
Bidding
$500,000 CJ est. value
New Prague, MN 56071

Twin Cities Habitat For Humanity
Renovation
Post-Bid
Prior Lake, MN 55372

Quarry Lake Outlet Project
Infrastructure
Post-Bid
$463,975 CJ est. value
Shakopee, MN 55379

House Removal 1772 Marschall Road
Demolition - 1,196 SF
Results
Shakopee, MN 55379

House Removal 6121 140th Street Northeast
Demolition - 1,924 SF
Results
Prior Lake, MN 55372

Chase Bank / Savage
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Savage, MN 55378

70th Street Speculative Warehouse
New Construction, Infrastructure - 506,000 SF
Pending Verification
$53,000,000 CJ est. value
Shakopee, MN 55379

2024 Full-Depth Pavement Reconstruction - CIF-24-001 - City of Shakopee
Infrastructure
Conception
$1,525,000 CJ est. value
Shakopee, MN 55379

Innovation Center/Incubator - BA-20-005 - City of Shakopee
New Construction, Infrastructure - 36,000 SF
Design
$12,000,000 CJ est. value
Shakopee, MN 55379

Cedar Lake Farm Regional Park Campground
Infrastructure, Renovation
Bidding
$700,000 CJ est. value
New Prague, MN 56071

Last Updated 02/21/2023 10:17 AM
Project Title

Riley Road and James Parkway Subdivision

Physical Address View project details and contacts
City, State (County) Elko New Market, MN 55020   (Scott County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $35,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 90 lot residential subdivision. As of February 21, 2023, this project is currently on hold. It has received recommendation of concept plan approval from the Elko New Market Planning Commission. Final plat approval is still needed. The developer is also acting as the general contractor. A firm construction timeline has not been announced.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents