Similar Projects
New Shoulders on IL 163
Infrastructure
Bidding
$2,000,000 CJ est. value
Millstadt, IL 62260

2022 Street Rehabilitation Woestboul Street
Infrastructure
Bidding
$1,100,000 CJ est. value
East Saint Louis, IL 62203

Caseyville Township East Plant Terminal Lift Station Crane
Renovation
Post-Bid
IL

North Jefferson Street (Il 4) Shared Use Path
Infrastructure
Post-Bid
$324,013 est. value
Mascoutah, IL 62258

Building Demolition and Site Work - AMP 3
Demolition
Results
Centreville, IL

Storm water pump station rehab at the 25th Street Pump Station
Infrastructure
Results
IL

Lexington Lift Station Upgrades
Renovation
Bidding
$160,000 est. value
Millstadt, IL 62260

L and N Railway Trail and Trailhead
Infrastructure
Post-Bid
$981,000 est. value
Mascoutah, IL

Site Preparation and Oil and Chip Treatment at Peabody River King State Fish and Wildlife Area
Infrastructure
Results
IL

PY 2021 CDBG - Laurel Street Improvements - 700 Block - Phase 2
Infrastructure
Bidding
$2,000,000 CJ est. value
Millstadt, IL 62260

Wastewater Treatment Facility
New Construction, Infrastructure
Post-Bid
Summerfield, IL 62254

Lift Station Rehabilitation PY20
New Construction
Results
$600,000 est. value
Alorton, IL 62207

Runway 14L/32R Rubber Removal and Marking
Infrastructure
Bidding
$113,000 CJ est. value
Mascoutah, IL 62258

Coldwater Creek WWTF Repairs and Improvements (2023)
Renovation, Infrastructure
Post-Bid
$8,200,000 CJ est. value
East Saint Louis, IL 62201

Lift Station Rehabilitation PY20
Renovation
Results
East Saint Louis, IL 62205

Last Updated 07/28/2022 10:34 AM
Project Title

Lift Station Rehabilitation PY21 (42nd Street and Market Avenue)

Physical Address View project details and contacts
City, State (County) Centreville, IL 62207   (Saint Clair County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $154,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 14, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** **As of June 20, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** All work shall be constructed under the provisions of the Standard Specifications for Road and Bridges Construction prepared by the Department of Transportation of the State of Illinois, adopted January 1, 2022 and the Standard Specifications for Water and Sewer Main Construction in Illinois, July 2009, Sixth Edition. The only exception to these standards, are all references to measurement and payment. Bidder's must also complete forms marked with an *. Bidder's subcontractor must provide information for the forms marked with two ** All documents must be submitted with the Bid. The project consists of rehabilitating the existing submersible duplex lift station at the intersection of 42nd Street & Market Avenue, including removal and replacement of lift station pumps, control panel, valves, pressure gauge, guide bars, float switches, lift cables, trash strainer basket, disconnect switches, power & alarm cables, and discharge pipe, together with new fencing, restoration of all disturbed surfaces, and all other incidental work required to complete the project. The federal prevailing wage rate (Davis Bacon Act) shall be paid. Bidders are required to comply with the Presidents Executive Order No. 11246 as amended. Awarded contract will be federally funded in part with a grant by HUD. Not less than (15%) of the total contract amount must be expended with a Minority Business Enterprise. Contact the St. Clair County IGD, (618.825.3211) for questions on MBE participation

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents