Similar Projects
Excavation Work for Gateway Preparatory Academy
Infrastructure
Design
$130,000 CJ est. value
Enoch, UT 84721

Brian Head Town Trail Phase 3 Project
Infrastructure
Design
$80,000 CJ est. value
Brian Head, UT 84719

Southwest Technical College A&T Building Sidewalk, Paving and Waterway
Infrastructure
Bidding
$196,000 CJ est. value
Cedar City, UT 84720

Southwest Technical College A&T Building Sidewalk, Paving and Waterway
Infrastructure
Bidding
$196,000 CJ est. value
Cedar City, UT 84720

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Paved Town Trail Phase III
Infrastructure
Post-Bid
Brian Head, UT

SR -14 Woods Ranch EB Passing Lane
Infrastructure
Results
$1,500,000 to $3,000,000 est. value
UT

SR-289; SUU Loop
Infrastructure
Results
$500,000 to $1,500,000 est. value
UT

Toboggan Lane and Snowman Drive Waterline Project
Infrastructure
Design
Brian Head, UT 84719

Southwest Technical College a&t Building Sidewalk Paving and Waterway
Infrastructure
Bidding
$196,000 CJ est. value
Cedar City, UT 84720

Center Street Tree Grate Installation and Sidewalk Repair Project - 2022
Infrastructure
Post-Bid
Cedar City, UT

I-15; South Cedar To North Cedar
Infrastructure
Results
$500,000 to $1,500,000 est. value
UT

Canyon Sewer Line Capacity Project
Infrastructure
Design
$500,000 CJ est. value
Brian Head, UT 84719

Asphalt Street Crack Seal Chip Seal Asphalt Oil Applicator Crack Sealant Chip Seal Oil Materials
Infrastructure
Post-Bid
Cedar City, UT

DFCM Construction-Standard Low Bid-Old Iron Towns Site
Infrastructure
Results
$160,000 est. value
Cedar City, UT 84720

Last Updated 04/24/2023 07:42 PM
Project Title

Kitty Hawk Site Improvement - USFS Rocky Mountain Research Station

Physical Address View project details and contacts
City, State (County) Cedar City, UT 84721   (Iron County)
Category(s) Heavy and Highway, Laboratory
Sub-Category(s) Laboratory, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

KITTY HAWK SITE IMPROVEMENT Submit all Proposals by Email to: Lonnie D. Root - Contracting Office Email: lonnie.root@usda.gov Questions and Clarifications Email: COR: Nathaniel Coffman nathaniel.coffman@usda.gov Delivery: 06/01/2023 Period of Performance: 04/28/2023 to 06/01/2023 0001 Base Scope - Office Trailer Foundation, Electrical & Plumbing IAW Statement of Work, Specifications and all Applicable Documents attached within the Solicitation. 0002 Option West Greenhouse Foundation. 1 LS Includes 12-inch dia. concrete foundation piers, approximately 320 SF of concrete sidewalk, and approximately 1,408 SF of crushed gravel covering the rest of the greenhouse floor area. IAW Statement of Work, Specifications and all Applicable Documents attached within the Solicitation. (Option Line Item) 0003 Option East Greenhouse Foundation. 1 LS Includes 12-inch dia. concrete foundation piers, approximately 320 SF of concrete sidewalk, and approximately 1,408 SF of crushed gravel covering the rest of the greenhouse floor area. IAW Statement of Work, Specifications and all Applicable Documents attached within the Solicitation. (Option Line Item) Option West Greenhouse Frame Erection 1 LS to include furnishing and installation of polycarbonate skins - IAW Statement of Work, Specifications and all Applicable Documents attached within the Solicitation. (Option Line Item) 0005 Option East Greenhouse Frame Erection 1 LS to include furnishing and installation of polycarbonate skins - IAW Statement of Work, Specifications and all Applicable Documents attached within the Solicitation. (Option Line Item) Between $150,000 to $350,000. Offerors are encouraged to submit all questions in writing at least five (5) days prior to the conference. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This work shall consist of the construction staking of roads, parking lots, parking spurs, family units, tent pads, paths, stairways, culverts, retaining walls, buildings, and utilities in accordance with the Drawings and Specifications. The work includes the furnishing of all labor, equipment, instruments, materials, transportation and other incidentals necessary to complete the construction staking in accordance with these specifications and acceptable engineering practice. This project is for site improvements at the Color Country Interagency Fire Center to accommodate a new modular lab building and two greenhouses. The Color Country Interagency Fire Center is located at 1770 Kitty Hawk Dr, Cedar City, UT 84721. The contractor is responsible to provide all labor, equipment, supplies, and materials for the supply and installation all water, sanitary sewer, electrical, and telecommunications infrastructure as well as foundation preparation for the proposed building(s). The RMRS Shrub Sciences Lab is currently in a 12-month rental space until August 31, 2023. This work must be completed in time for their mid-term office trailer to be delivered on June 1, so that there is time for IT wiring and installation, utility connection, and actions necessary to occupying the building before the rental period expires.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings, Doors and Frames, Windows, Vents.
Division 09 - Finishes, Tiling, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Institutional Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents