Similar Projects
Reconstruction of the I-135/36th Street Interchange
Infrastructure
Conception
$15,074,608 CJ est. value
Newton, KS 67114

Reconstruction of the I-135/36th Street Interchange
Infrastructure
Conception
$15,074,608 CJ est. value
Newton, KS 67114

Kansas Avenue Office and Retail Development Phase 1
New Construction, Infrastructure - 15,000 SF
Design
$80,000,000 CJ est. value
Newton, KS 67114

Centennial Park Ball Fields
Infrastructure
Post-Bid
$200,000 CJ est. value
Newton, KS 67114

E 1st St & I-135 - Roundabout Paving
Infrastructure
Post-Bid
$600,000 CJ est. value
Newton, KS 67114

Chip Seal - K148 Fr K148/K28 JCT E TO K148/US81 JCT in RP and JW Co. Lgth 22.50 MI.
Infrastructure
Results

Chip Seal. k-68; Ka 6374-01; Fr k-33/k-68 Jct e 1.027 Mi to Fr/Mi Co Ln in Fr Co. Ka 6375-01; Fr Fr/Mi Co Ln 12.40 Mi e to u-169/k-68 Jct In Mi Co. Length 13.414 Mi.
Infrastructure
Results

30-I.2 Bridge Replacement - Harvey County
Demolition, New Construction, Infrastructure
Conception
$750,000 CJ est. value
Pleasant, KS 67114

Pavement Patching. Ramps on i-135 to Us-50 Fr Us-50 and Access Rd to/Fr First/Broadway in Hv Co. Lgth 2.00 Mi.
Infrastructure
Results
KS

New Shop Complex- Harvey County
New Construction, Infrastructure
Conception
$13,000,000 CJ est. value
Newton, KS 67114

Milling and HMA Overlay
Infrastructure
Results

CCLIP Mill and Overlay of K-15 Highway
Infrastructure
Results
$900,000 est. value
Newton, KS 67114

Grading, Bridge and Surfacing
Infrastructure
Results
$661,672 CJ est. value
Newton, KS 67114

Last Updated 01/09/2023 08:04 AM
Project Title

O-22.6 Bridge Replacement - Harvey County

Physical Address View project details and contacts
City, State (County) Newton, KS 67114   (Harvey County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2025
Bids Due View project details and contacts
Estimated Value $895,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined This project is in included in the Harvey County FY 2023-2027 Capital Improvement Plan (CIP). As of January 09, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents