Similar Projects
Dike & Revetment - USACE St. Louis District
Design
$15,000,000 est. value
Cairo, IL

Locks 27 Miter Gate Anchorages Replacement
Renovation, Alteration
Design
$1,000,000 to $5,000,000 est. value
Granite City, IL 62040

Maintenance, and Repair Services for the Chicago Tunnel Systems and Pump Stations
Renovation
Bidding
Chicago, IL

Mel Price Lift Gate Replacement
Post-Bid
Alton, IL

Mel Price Main Lock Overlook Alterations
Renovation
Post-Bid
Alton, IL 62002

Crab Orchard NWR Devils Kitchen Dam Aux Splway
Results
$500,000 to $1,000,000 est. value
Marion, IL

Waukegan Harbor Breakwater Repairs, Waukegan, Lake County, Illinois
Results
$1,000,000 to $5,000,000 est. value
Waukegan, IL

Illinois River Basin Dresden Island Lock and Dam;
Renovation
Design
$10,000,000 est. value
IL

Illinois River Basin; Brandon Road Lock, Will County, Il, Upper Bulkhead Recesses
Renovation
Post-Bid
$10,000,000 est. value
IL

Peoria and LaGrange Dams Composite Wicket Gates
Results
Peoria, IL

MPLD Main Lock Overlook Alterations
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
East Alton, IL

Crab Orchard Dam Spillway Concrete Repairs
Results
$1,000,000 to $5,000,000 est. value
IL

Market Survey_Olmsted Dam Maintenance Support Contract
Renovation
Post-Bid
$8,200,000 est. value
Olmsted, IL 62970

Touhy Dam Removal
Results
Park Ridge, IL 60068

Replacement of Tainter Gate Brakes and Side Seal Heaters Carlyle Lake
Renovation
Post-Bid
$100,000 to $250,000 est. value
Carlyle, IL

Last Updated 04/13/2022 12:50 PM
Project Title

Chicago Harbor Lock Power Distribution Upgrades

Physical Address View project details and contacts
City, State (County) Chicago, IL 60604   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT INFORMATION: The project includes the removing an existing generator and replacing with a new 300 KVA standby generator along with its associated new conductors and conduits. The scope also includes replacing incompatible conduits and all associated conductors. This project is located at the Chicago Harbor Lock, in Chicago Illinois.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents