Similar Projects
HVAC Upgrades to West Virginia State Office Building Nos. 5, 6, & 7
Renovation
Design
$50,000 CJ est. value
Charleston, WV 25301

Westside High School HVAC Testing Adjusting and Balancing Project
Renovation - 119,579 SF
Sub-Bidding
$180,000 CJ est. value
Clear Fork, WV 24822

Phase 3A - HVAC Replacement and Renovation for: Chamberlain Elementary School
Renovation
Sub-Bidding
$3,800,000 CJ est. value
Charleston, WV 25304

Boiler Plant Services
Term Contract, Alteration
Post-Bid
Huntington, WV 25704

Heat Pumps CRHS Baseball Building 1
Alteration
Post-Bid
Chapmanville, WV 25508

Supply and Install HVAC in Administration Building
Alteration
Results
Beaver, WV 25813

Operations Building HVAC Renovation Design Camp Dawson
Alteration
Results
$55,800 est. value
WV

Provide & Install a New Gas Boiler in the Kanawha County Courthouse
Addition, Demolition, New Construction, Build-out, Renovation
Construction
$301,000 CJ est. value
Charleston, WV 25302

Edison Middle School HVAC Renovations
Renovation
Construction
$3,727,400 CJ est. value
Parkersburg, WV 26101

HVAC Replacement at Hamlin PK8
Renovation
Sub-Bidding
$300,000 CJ est. value
Hamlin, WV 25523

Air Purification (Ionization) Equipment
Alteration
Post-Bid
Beckley, WV

Smith Hall HVAC Renovation - Cooling Tower
Alteration
Results
Huntington, WV

Phase 3B - HVAC Replacement and Renovation for: Pratt Elementary School
Renovation
Sub-Bidding
$1,300,000 CJ est. value
Hansford, WV 25103

15 Ton Heat Pump
Alteration
Post-Bid
South Charleston, WV

HVAC Renovations of a MLK and North Charleston Rec Centers
Alteration
Results
Charleston, WV 25301

Last Updated 07/07/2023 03:07 PM
Project Title

J045--Boiler Tuning and Fan Balancing

Physical Address View project details and contacts
City, State (County) Beckley, WV 25801   (Raleigh County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Page 10 of 13 STATEMENT OF WORK Semi-Annual Tuning Service for Fire Tube Boilers General Scope: This project consists of testing, inspecting, checking, and adjusting combustion gas and oil settings on Scotch Marine Boilers (3 Each) at VAMC Beckley, WV, per IAW Boiler Safety Device Testing Manual, 7th Edition (January 2023), and VHA Directive 1810 (January 2023). This is a base year +4 optional year(s) contract. This is a semi-annual service that requires multi-day trips to complete boiler tuning service. This exercise requires a certified Fireye Burner controls installer/repair technician. Technician must follow recommended test procedures prescribed by BEI Safe Steaming Device Testing Manual 7th Edition. Check low water cutoff alarm system. Check low water shunt switch. Check auxiliary low water cutoff alarm system. Check auxiliary low water shunt switches. Check high and low water alarms. Check high steam pressure cutouts. Check steam safety valves (x2) each boiler. (Lift pressures are 120psi and 125psi per boiler.) Check flame scanner. Check high and low gas pressure switches, adjust if necessary. Check high and low oil switches, adjust if necessary report final settings. Check all combustion air switches and purge switches, adjust if necessary. Adjust burner combustion settings and calibrate oxygen trim on each fire tube boiler. Perform Yearly accumulation test on each boiler Check all gas vents for leaks. Check gas fuel safety shut off valves proof of closure. Check fuel oil safety shut off valves proof of closure. Check operation of Liquid Petroleum Gas Pilot. Check Low Oxygen alarm and/or cutout. 19. Check vibration of burner fans semi-annually at each tuning. Check, Adjust, and Record (on final report) timing parameters for (Pre-purge, Post-purge, Ignitor, Main Flame Ignition, and Flame Out). Calibrate instrumentation, monitoring, and control systems. Check Furnace pressure Check Combustion gas leaks into boiler room. Calibrate and Test O2 monitoring system for entire boiler plant, adjust as necessary for tuning purposes, provide calibration documentation along with tuning documentation. Provide site visit reports documenting all discrepancies, adjustments, and final settings of tuned, calibrated, and adjusted parameters. Place of Performance: Tasks will be performed in the boiler plant at the VAMC Beckley, WV in accordance with VA Master Specifications. Work will be in an occupied healthcare facility in operation 24 hours a day and care must be provided to keep work areas clean and contained. *The contractor will be responsible for storage of materials and disposal of all unused materials. **The contractor will ensure that all sub-contractors meet and abide by all government regulations and requirements to include 30 hour OSHA training for superintendent and 10 hour OSHA training for workers. The method of Contractor Selection has not been Determined at this time.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents