Similar Projects
Cooling Tower Replacement
Post-Bid
Less than $2,700,000 est. value
Boca Raton, FL 33431

Mechanical Renovations at Horizon Middle School & Kissimmee Middle School
Post-Bid
Less than $1,900,000 est. value
Kissimmee, FL 34746

Preventive Maintenance and Repair Services for Heating, Ventilation, Air Conditioning and Refrigeration Equipment - Chilled Water Systems and Secure Locations
Term Contract
Results
Kissimmee, FL 34741

J--Service: Replacement of Trailer Air Conditioner Units
Results
Gainesville, FL 326081135

HVAC Maintenance
Post-Bid
Jacksonville, FL 32203

PBSO District 3 - HVAC Replacement
Term Contract
Results
West Palm Beach, FL

Southport Middle School - Air Handling Retrofit Project
Post-Bid
Port Saint Lucie, FL 34952

J--GM-Vacuum Furnace Preventative Service
Results
Jacksonville, FL 32212

PBSO Real Time Crime Lab - HVAC Upgrades
Term Contract
Post-Bid
West Palm Beach, FL 33406

Hood and Duct Cleaning Service
Results
Hurlburt Field, FL 32544

Orange Park High School - HVAC Repair/Replacement Building 4 Gymnasium
Post-Bid
Orange Park, FL 32073

FDOT HVAC Install: Sneads WB Weigh Station
Results

S--Service: HVAC Air Duct Cleaning
Post-Bid
Bay Pines, FL 33744

HVAC Direct Digital Control System Service
Term Contract
Results
Less than $55,000 est. value
FL

Tampa Union Station RTU-7 AC Replacement
Post-Bid
Tampa, FL 33602

Reported 06/12/2020 12:00 AM
Project Title

Tyndall AFB, FL - Repair Dormitories HVAC Multi

Physical Address View project details and contacts
City, State (County) Panama City, FL 32403   (Bay County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This Design-Build effort is intended to replace the Geothermal Ground Water Cooling Loop as the primary source of cooling water for each of the identified buildings. This new system will consist of Multiple Individual Water-Cooled Cooling Towers connected to the existing water loop using automated valves controlled by the EMCS system. This will allow the switching between the Ground water loop and the Cooling towers to maximize cooling. Additionally repair/restore and perform hydronic flow test and provide user with test results and flush the interior HVAC elements for each of the Dormitories B1050, 1053 &1054 that are identified as problematic and are within the scope of work below. The project is located on Tyndall Air Force Base (AFB). The Design-Build Team will consist of a Construction and design team Designer of Record (DOR) that shall perform the services herein and as described in this Statement of Work (SOW).

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents