Similar Projects
Capitol Building Redevelopment
New Construction - 20,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Washington, DC

9th and V Street Apartments
New Construction - 230,000 SF
Conception
$10,000,000 CJ est. value
Washington, DC 20001

Brookland Manor
New Construction
Design
Washington, DC 20018

Bearden Arts Building
New Construction - 26,000 SF
Design
Washington, DC 20002

Ridgecrest Apartments
Renovation - 124,600 SF
Sub-Bidding
$10,000,000 est. value
Washington, DC 20020

Colorado Avenue Cooperative Apartments
Renovation
Post-Bid
Washington, DC 20011

13th Street Housing
New Construction
Post-Bid
Less than $5,000,000 est. value
Washington, DC 20032

3701 New Hampshire Avenue Northwest - Apartments
New Construction - 3,000 SF
Construction
Washington, DC 20010

Parkside - Parcel 11
New Construction
Construction
$42,400,000 est. value
Washington, DC 20019

The Butterworth Mansion
Renovation, Addition
Pending Verification
Washington, DC 20001

Edgewood Commons
New Construction
Pending Verification
Washington, DC 20017

25th Street Senior Housing
New Construction
Conception
Washington, DC

The Ladybird
New Construction - 13,000 SF
Design
Washington, DC 20016

First Street Apartments - Phase II
New Construction - 122,123 SF
Post-Bid
Washington, DC 20024

The Gantry
New Construction - 674,005 SF
Construction
$10,000,000 CJ est. value
Washington, DC 20002

Reported 08/25/2021 12:00 AM
Project Title

Crawford Landing Townhomes

Physical Address View project details and contacts
City, State (County) Washington, DC 20019   (District of Columbia County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method General Contractor to Subcontract.
Project Status Sub-Bidding, Construction Start Expected September 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Apartments/Condominiums, 3 Stories Above Grade, 55,171 SF New Construction, 28 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 14 - Conveying Equipment, Commissioning of Conveying Equipment, Commissioning of Elevators.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents