Similar Projects
Dock Expansion - Phase II
Addition, Infrastructure - 21,000 SF
Design
Pharr, TX

Bulk Dock 2 Breasting Structure 4, Pile 3 and 4 Reinforcement
Infrastructure
Bidding
Corpus Christi, TX 78403

Scotts Bridge Bulkhead Repair
Renovation
Bidding
Conroe, TX

Lake Houston Boat Ramp Replacement Services
Post-Bid
Houston, TX 77251

Derelict Vessel Removal Services
Post-Bid
Austin, TX 78701

Sources Sought for Access Dock Fire Pump and Pier Repairs - Maritime Administration Beaumont Reserve Fleet
Results
Beaumont, TX 77705

Construction Manager-At-Risk for a Rollover Recreational Area Pier on the Bolivar Peninsula in Galveston County, Texas
Results
Less than $200,000 est. value
TX

Southeastern Freight Lines
Renovation
Construction
El Paso, TX 79907

Phase 1 South Trail, North Loop Trail, Leonabelle Turnbull Board Walk
Infrastructure
Bidding
Port Aransas, TX 78373

Pier 10 Redevelopment / Pier 10 and 12 Dock Repairs
Infrastructure
Post-Bid
$5,500,000 est. value
Galveston, TX

Beachside Redevelopment at Galveston Island State Park
New Construction
Results
$11,625,000 to $13,440,000 est. value
Austin, TX 78744

Pier 39-40 Mooring Modifications
Infrastructure
Post-Bid
Galveston, TX

Ancel Brundrett Memorial, Robert`s Point Park and Charlies Pasture Pier Reconstruction Hurricane Harvey Repairs
Results
Port Aransas, TX 78373

Berth 6 Expansion Project
Infrastructure
Post-Bid
Port Arthur, TX

Bulk Dock 1 West Trestle Beam Repairs
Results
Corpus Christi, TX 78403

Last Updated 01/19/2022 05:03 AM
Project Title

ACND - Rockport Harbor Bait Stand Project

Physical Address View project details and contacts
City, State (County) TX   (Aransas County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work generally as follows: removal of existing deck materials and construction of new piling, deck framing, decking and bait stand with electrical for a complete project in place.

Details

Division 05 - Metals, Metal Decking.
Division 06 - Wood, Plastics, and Composites, Composite Decking.
Division 35 - Waterway and Marine Construction, Floating Construction, Floating Piers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents