Similar Projects
International School at Mesa Del Sol
New Construction - 1,085,000 SF
Design
$10,000,000 CJ est. value
Albuquerque, NM 87105

Construction of the NMSD Dining Hall Renovation
Renovation
Bidding
Santa Fe, NM 87505

Municipal Schools Riverside Elementary School Remodel / Addition
Renovation
Bidding
Carlsbad, NM

Laguna Elementary School Design Build
Post-Bid
Laguna, NM

Laguna Elementary School Design Build
Post-Bid
Laguna, NM

Peralta Elementary School Education Specifications
Results
Peralta, NM

Construction of Cameo Elementary School and Mesa Elementary School Systems Replacements
Results
Clovis, NM 88101

Construction of Mountain Elementary School Systems Project
Construction
Less than $4,239,487 est. value
Los Alamos, NM 87544

Los Ninos Elementary School Building Systems Upgrade Phase 2 Work
Construction
Las Vegas, NM

General Contractors Small Projects On-Call
New Construction
Bidding
Albuquerque, NM

Office Subdivision
Renovation - 240 SF
Post-Bid
Sandia Park, NM 87047

Coyote Willow Family School Phase 2
Addition - 16,000 SF
Results
Albuquerque, NM 87114

Los Alamos High School Fieldhouse Construction
Construction
Los Alamos, NM 87544

Artesia High School Science Wing Rooftop Replacement
Renovation
Bidding
Artesia, NM 88210

Construction of the NMSD 2019 Renovations
Renovation
Post-Bid
Santa Fe, NM 87505

Reported 03/26/2021 12:00 AM
Project Title

Nita M. Lowey 21st Century Community Learning Centers

Physical Address View project details and contacts
City, State (County) Santa Fe, NM   (Santa Fe County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents