Similar Projects
Z--Rehabilitate Parking Area, Ruby Beach
Term Contract, Infrastructure, Alteration
Design
$500,000 to $1,000,000 est. value
Port Angeles, WA 98362

Repair Slumps on Hurricane Ridge and Obstruction Point Road
Alteration
Bidding
$500,000 to $1,000,000 est. value
Port Angeles, WA

SR 96, North Creek Fish Passage
Infrastructure
Bidding
$2,500,000 to $3,000,000 est. value
Mill Creek, WA 98082

Rainier Beach High School Bid Packages - 09 Soldier Pile Wall
Infrastructure
Sub-Bidding
$150,000 est. value
Seattle, WA 98118

Engineering Services for McSorley Creek Shoreline & Estuary Restoration Project
Renovation, Alteration
Post-Bid
$950,000 est. value
Des Moines, WA 98198

Geosynthetic and Erosion Control
Infrastructure
Post-Bid
WA

North South Monument Site Development
New Construction, Infrastructure, Alteration
Results
Bremerton, WA

2021 Horse Creek Streambed Repairs Project
Infrastructure
Results
$90,000 to $100,000 est. value
Bothell, WA 98011

Salmon Creek Drainage
Infrastructure
Bidding
$350,000 est. value
Okanogan, WA

Lower Satsop Right Bank Conservation
Infrastructure
Post-Bid
Montesano, WA

Deception Creek Line Extension
Infrastructure
Results
$2,235,825 est. value
WA

Lower Dungeness River Floodplain Restoration and Levee/Road Realignment Phase 2 Earthwork contract
Infrastructure
Bidding
$560,000 est. value
Port Angeles, WA

Lummi Nation Seapond Dike Repair and Armoring
Infrastructure
Post-Bid
Bellingham, WA

Storm Renewal and Replacement Project
Infrastructure
Results
$620,000 to $650,000 est. value
Auburn, WA 98092

Salmon Creek Cutover
Infrastructure
Bidding
$110,000 est. value
Sumner, WA 98390

Last Updated 05/27/2022 03:31 AM
Project Title

Duck Lake - Johnson Creek Consolidation Project

Physical Address View project details and contacts
City, State (County) Omak, WA   (Okanogan County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $650,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of approximately 14,000 linear feet of 3-in. HDPE piping to provide the current Johnson Creek Water User's Association with a clean source of potable water from the current Duck Lake Water Association. This project also includes the construction of a new building containing booster pumps and appurtenances, and new electrical facilities that serves to fill the existing Johnson Creek supply reservoir. Installation of the new 3-in. pipe will include air/vacuum assemblies, blow-offs, and isolation valves along its alignment. This project will also include the decommission of the existing wells at the current Johnson Creek wellhouse due to their unacceptable water quality. Successful bidder shall commence work on or before the date specified in a written "Notice to Proceed" of the Association and shall fully complete all work within one hundred forty (140) calendar days thereafter.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents