Similar Projects
Last Updated | 03/14/2022 12:22 AM |
Project Title | NM173 Phase 1 Waterline Relocation |
Physical Address | View project details and contacts |
City, State (County) | Aztec, NM (San Juan County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work of this pipeline relocation involves the installation of approximately 8,660 feet of 8-inch diameter C900 PVC pipe and fittings, along with 21 gate valves and one hydrant within the right-of-way (ROW) of NM 173. The new pipe will be installed at a minimum depth of 3 feet below existing grade, with the pipe deeper in other sections where soil will be removed during road improvements. Upon completion of road improvements, the pipe will have a minimum cover of 4 feet. Also included in this project is the installation of a surge anticipation valve in the existing East Aztec Pump Station. All materials will be provided by the City of Aztec. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |