Similar Projects
RFQ Design - Design and Construction Administration Services - Police Department Additions and Renovations
Addition, Demolition, Renovation, Infrastructure
Conception
$3,500,000 CJ est. value
Coeur D Alene, ID 83814

Kootenai Bunco Road Improvements
Term Contract
Design
Athol, ID 83801

NIC: Resurfacing Parking Lots
Infrastructure
Bidding
$870,000 CJ est. value
Coeur D Alene, ID 83814

NIC: Resurfacing Parking Lots
Infrastructure
Bidding
$870,000 CJ est. value
Coeur D Alene, ID 83814

MCOP Water Meter Purchase
Infrastructure
Post-Bid
Coeur d'Alene, ID

2022 Road Improvement Projects
Infrastructure
Post-Bid
Hayden, ID 83835

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

Ramsey Z-Wall Extension
Addition, Alteration
Results
Coeur d'Alene, ID 83815

New Football Field - Coeur d'Alene High School
Infrastructure
Pending Verification
$1,375,000 CJ est. value
Coeur D Alene, ID 83815

New Football Field - Coeur d'Alene High School
Infrastructure
Pending Verification
$1,375,000 CJ est. value
Coeur D Alene, ID 83815

Ross Point Phase 2
Infrastructure
Bidding
$500,000 CJ est. value
Post Falls, ID 83854

Pavement Markings
Term Contract
Post-Bid
Hayden, ID

Engineering Services for Design Of Worley Minor Streets Repair Phase 2
Infrastructure
Results
Worley, ID 83876

Steam Plant Elimination, Phase 1
Infrastructure
Bidding
$386,000 CJ est. value
Coeur D Alene, ID 83814

Supply and Apply Gravel Road Stabilization
Infrastructure
Post-Bid
Coeur d'Alene, ID

Last Updated 08/03/2022 06:32 PM
Project Title

Snow Removal Equipment (SRE) Building Coeur d'Alene Airport

Physical Address View project details and contacts
City, State (County) Hayden, ID 83835   (Kootenai County)
Category(s) Commercial, Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development, Warehouse/Storage, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,783,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 11, 2022, this project has not yet been awarded. A timeline for award has not yet been established. Budget estimate is between $2.5 and $3.0 million. Work associated with proposed improvements is generally described as follows: Schedule A: Snow Removal Equipment (SRE) Building Schedule B: Paving of Approaches and Asphalt Patch Schedule C: Sewer Extension, Oil Water Separator, Concrete Floor, Floor Drain Schedule D: Windows Schedule E: Water Extension, Spigot, Fire Hydrant Snow Removal Equipment Building consists of all elements necessary to construct a pre-engineered metal building for storage of the airport's snow removal equipment. Work generally consists of the construction of a Snow Removal Equipment Building (approximate gross size 8,272 sft) with associated utility extensions, and vehicle access to taxiway and roadway. Work includes sitework to construct the new building to include: surveying, erosion control, excavation, embankment, subbase course, base course, asphalt paving, stormwater modifications and improvements, utility work, topsoil, seeding and other miscellaneous items. Building items include foundation and floor concrete, steel supply and erection, insulation, glass, overhead and man doors, HVAC, roofing, and electrical. The work shall be complete and ready for final inspection in three hundred sixty-five (365) calendar days for Schedule A work. A site visit is available at the Contractor's request. Please call 208-446-1860 forty-eight hours in advance of desired visit to coordinate a time with airport operations. No questions may be directed to the airport staff during site visit. Each bidder must supply all the information required by the Bid Documents and Specifications. All prospective bidders are directed to the Instructions for Bidders for discussion of Bid policies, procedures, and requirements. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade, and the Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, the Executive Order and the regulations in 41 CFR Part 60-4. Compliance with the goals will be measured against the total work hours performed. 3. The Contractor shall provide written notification to the Director of the Office of Federal Contract Compliance Programs (OFCCP) within 10 working days of award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the name, address, and telephone number of the sub Contractor; employer identification number of the sub Contractor; estimated dollar amount of the subcontract; estimated starting and completion dates of the subcontract; and the geographical area in which the subcontract is to be performed. 4. As used in this notice and in the contract resulting from this solicitation, the "covered area" is the State of Idaho, Kootenai County, and the City of Hayden. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

8,272 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents