Similar Projects
DFCM Construction-Pre Qualified Mechanical-Udot Rampton MTF Building AHU and Unit Heaters
Alteration
Bidding
$771,000 est. value
West Valley City, UT 84119

DSU - Taylor Dental Chiller Project
Alteration
Bidding
Saint George, UT

Parks and Recreation Building HVAC Upgrades
Post-Bid
Less than $497,592 est. value
Salt Lake City, UT 84104

Canyonlands Field Airport Upgrade to Terminal Building Roof Top Units
Post-Bid
Moab, UT 84532

HEB Southeast Tower Fume Hood Upgrade
Results
$1,521,698 est. value
Salt Lake City, UT 84112

South Valley Services - HVAC Remodel/Construction
Results
West Jordan, UT 84088

Fire Station Hot Water System Re-Pipe
Post-Bid
Riverton, UT 84065

HVAC Modifications
Results
Monticello, UT 84535

Weatherization Assistance Program
Post-Bid
Orem, UT 84097

Fashion Square Condenser Pump Replacement
Results
Less than $180,000 est. value
Murray, UT 84107

Biology Building Fume Hood Upgrade
Post-Bid
Salt Lake City, UT 84112

UNG North Salt Lake Armory RTU Units Replace
Results
Less than $280,000 est. value
Salt Lake City, UT 84129

Monticello High School HVAC
Post-Bid
Monticello, UT 84535

HVAC Maintenance Services
Term Contract
Results
Sandy, UT

Mini-Split Heat Pump/ HVAC /Air Purification System and its Installation
Post-Bid
Hinckley, UT 84635

Last Updated 12/22/2021 02:05 AM
Project Title

ATC Upgrades for Cedar Ridge, Deerfield, and Mount Mahogany Elementary Schools

Physical Address View project details and contacts
City, State (County) Alpine, Cedar Hills, Pleasant Grove, UT 84062   (Utah County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of: Upgrading the automatic temperature control (ATC) system or building automation control system existing in the school by replacing the existing. Provision and installation of the upgraded automatic temperature control system as indicated on drawings and within the specifications. Provision and installation of all new control valves and VFD’s.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents