Similar Projects
University of Saint Thomas STEAM Complex
New Construction
Conception
$100,000,000 est. value
Saint Paul, MN 55105

Amazon Warehouse
New Construction - 750,000 SF
Conception
$10,000,000 CJ est. value
Lakeville, MN

Kindeva Drug Delivery Warehouse
New Construction - 136,200 SF
Design
$10,000,000 CJ est. value
Woodbury, MN 55129

Mickelson Invesments Building
New Construction - 12,700 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Clearwater, MN

Minneapolis Community and Technical College Management Education Center(MEC) New Harmon Building
New Construction
Bidding
$18,200,000 est. value
Minneapolis, MN 55403

Technical/Trades Lab Addition and Renovation
Addition
Bidding
$200,000 est. value
Pine City, MN 55063

Ancillary Products Pillsbury Hall Rehabilitation
Renovation
Post-Bid
Minneapolis, MN 55455

System Furniture Pillsbury Hall Rehabilitation
Renovation
Post-Bid
Minneapolis, MN 55415

LSC Hawks Landing Student Lounge
Renovation - 3,500 SF
Results
Duluth, MN 55811

NCC-21-Microbiology Lab Renovation
Renovation
Results
Bloomington, MN

Freeborn-Mower Cooperative Services Headquarters
New Construction - 97,800 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Albert Lea, MN

Crossroads Mall Climate Controlled Storage
Renovation, Build-Out, Alteration - 10,600 SF
Pending Verification
Hastings, MN 55033

Warehouse
New Construction
Pending Verification
Rosemount, MN

UMD AB Anderson Hall
Renovation
Conception
$3,700,000 est. value
Duluth, MN 55812

Inverpoint Business Center - Building 3
New Construction - 107,838 SF
Design
$10,000,000 CJ est. value
Inver Grove Heights, MN 55076

Last Updated 08/19/2021 01:13 PM
Project Title

Bike Mechanics Interior Remodel

Physical Address View project details and contacts
City, State (County) Minneapolis, MN 55403   (Hennepin County)
Category(s) Commercial, Education
Sub-Category(s) College/University, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Scope: The work includes the finishing of the 4100 sft shell space on level 1 of Building T. Four hollow metal doors will be removed and replaced. One wall will be constructed to separate the mechanics space from the bike storage space. The entry condition has been reconfigured into an alcove. The space will be finished with painted furred sheetrock walls, patched in quarry tiles and existing concrete flooring- sealed, a grid of Unistrut at the ceiling for new track lighting and future monitors. The fire protection, mechanical, plumbing and electrical systems will be updated for the new bike mechanics space.

Details

Warehouse/Storage, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents