Similar Projects
Mill and Resurface Roadways
Infrastructure
Bidding
$330,000 est. value
FL

Pavement Rehabilitation
Infrastructure
Bidding
Fruit Cove, Ponte Vedra Beach, Saint Augustine, FL 32084

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

2nd Street Extension and Widening Improvements
Infrastructure
Post-Bid
Saint Augustine Beach, FL

Construction of Intersection Improvements on Solana Road at SR-A1A
Results
Less than $250,000 est. value
Saint Augustine, FL 32082

Asphalt Repair
Results
FL

Resurfacing/Concrete Rehabilitation/Drainage Improvements
Results
Less than $11,722,725 est. value
FL

Application of Rejuvenation Agent on Various Streets in St. Johns County
Results
FL

Roadway Signing, Traffic Signal
Results
Less than $1,500,000 est. value

Pavement Rehabilitation
Results
Fruit Cove, Ponte Vedra Beach, Saint Augustine, Saint Johns, FL 32259

Pre-Event Emergency Roadside Assistance Services
Results

Resurfacing
Results
$29,675,850 est. value
FL

Strategic Resource Evaluation Study - Highway Construction Materials
Infrastructure
Results

Countywide Pavement Maintenance and Rehabilitation Continuing Services
Infrastructure
Results
FL

Resurfacing - SR 206
Infrastructure
Results
$5,304,322 est. value
FL

Last Updated 03/03/2022 11:13 AM
Project Title

Construction of Old Moultrie Road Improvements from US 1 to Summerhill Circle

Physical Address View project details and contacts
City, State (County) Saint Augustine, FL 32086   (Saint Johns County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall be responsible for providing any and all labor, materials, and equipment required in order to construct roadway, drainage, and utility improvements for Old Moultrie Road from US 1 to Summerhill Circle in St. Augustine, St. Johns County, Florida. The Old Moultrie Road improvements consist of milling and resurfacing of the existing roadway, shoulder construction, sidewalk construction, pavement markings, and signage. Construction of new stormwater pipes and structures and a swale for drainage is required. Miscellaneous improvements include utility coordination and relocations to accommodate the proposed improvements. The project is located at Old Moultrie Road, St. Augustine, Florida 32084.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents