Similar Projects
King Beverage Distribution Facility
New Construction - 224,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Spokane, WA

RFQ Design - Architectural/Engineering Services for Public Works Office and Shops Building Project
New Construction, Demolition, Infrastructure
Conception
Spokane, WA

Koz on West 4th Avenue
New Construction, Infrastructure - 172,000 SF
Design
$98,800,000 CJ est. value
Spokane, WA 99204

Upriver Dam Spillway Rehabilitation Phase III-Rebid
Infrastructure
Design
$1,337,538 CJ est. value
Spokane, WA 99201

2022 Residential Grind and Overlay
Infrastructure
Bidding
$2,100,000 CJ est. value
Spokane, WA 99201

RFQ D/B - New Training Facility
New Construction, Infrastructure
Bidding
$7,100,000 CJ est. value
Spokane Valley, WA 99216

2022 Felts Field Site Improvements
Infrastructure
Post-Bid
Spokane, WA 99212

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Doris Morrison Learning Center Building Site and Trail
Renovation, Infrastructure - 6,000 SF
Results
WA

Sprague Union District Cso-34 Tank Above Ground Development
Infrastructure
Results
Less than $300,000 est. value
Spokane, WA 99202

Spokane International Airport Concourse C Trex - Bid Package No. 20 - General Construction
Addition, LEED Certification, Renovation, Infrastructure
Construction
$15,950,000 CJ est. value
Spokane, WA 99224

Pines Road Apartment Complex
New Construction, Infrastructure - 36,800 SF
Pending Verification
$4,000,000 CJ est. value
Spokane Valley, WA 99216

Rosewood Commercial Park
New Construction, Infrastructure - 36,000 SF
Pending Verification
$3,900,000 CJ est. value
Spokane, WA 99217

Sundance Meadows
New Construction, Infrastructure
Conception
$185,000,000 CJ est. value
Nine Mile Falls, WA 99026

Plastic Surgery Northwest Remodel
Addition, Demolition, Build-out, Infrastructure - 5,000 SF
Design
$1,800,000 CJ est. value
Spokane, WA 99202

Last Updated 12/09/2022 02:07 PM
Project Title

Aeration Lagoon Replacement

Physical Address View project details and contacts
City, State (County) Deer Park, WA 99006   (Spokane County)
Category(s) Heavy and Highway, Industrial/Manufacturing, Sewer and Water
Sub-Category(s) Industrial Warehouse, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $5,618,638 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 14, 2022, project was awarded to Halme Construction Inc, awarded amount is $5,618,638.03. Estimate cost:$5,500,000 - $5,900,000 The project generally consists of construction of a 7.6-million-gallon primary wastewater aeration treatment lagoon with double HDPE liner system, underdrain and leak collection piping, and a new effluent lift station with emergency backup power supply. The biosolids in the existing lagoon will be removed and disposed. Equipment in the existing wastewater treatment lagoon will be removed or salvaged after the new lagoon is in operation. A new pre-engineered storage building will be constructed on site. This project also includes site clearing and grubbing, gravity sewer improvements, site grading, stormwater improvements, electrical and control improvements for the new primary aeration lagoon system, and other items of work. All contractors must be licensed to conduct business in Washington State. All bid proposals shall be accompanied by a bid proposal deposit in the form of a certified check, cashiers check, or surety bond in an amount equal to five percent (5%) of the amount of such bid proposal. Only properly executed proposals submitted on the forms furnished by the City of Deer Park will be accepted. All bidders are required to submit a list of subcontractors that will perform work on the project amounting to ten percent (10%) or more of the contract amount. Rejection of Bids: The City of Deer Park shall have the right to reject any or all bids not accompanied by bid security or data required to by the bidding document or a bid in any way incomplete or irregular. The City of Deer Park shall have the right to reject all bids and not award the Work to any bidder. The City of Deer Park is an Equal Opportunity and Affirmative Action Employer. Disadvantaged Business Enterprises (Small, Minority- and Women-Owned Businesses) are encouraged to submit bids. All work performed on the project will be subject to the higher of the prevailing state or federal wage rates. It is anticipated that this project will be funded in part by the Washington State Department of Ecology. Neither the State of Washington nor any of its departments or employees are, or shall be, a party to this Contract or any subcontract. Award of the construction contract is contingent upon approval by the funding agency. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The CONTRACTOR agrees that the time allowed is a reasonable period to perform the Work and all work on this project shall be completed within 365 calendar days (1 year) after receipt of written Notice to Proceed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents