Similar Projects
Wastewater Pumping Station Rehabilitations Design-Build
Design
Less than $19,000,000 est. value
Tampa, FL 33602

AI Influent Pump Station Improvements
New Construction
Design
Less than $2,900,000 est. value
Saint Augustine, FL 32080

Lift Station No. 42 Replacement
Renovation
Bidding
Saint Petersburg, FL 33716

Utilities Pump Station Improvements Package 34
Renovation
Bidding
$2,315,584 est. value
Orlando, FL

Wastewater Pump Station Construction and Rehabilitation Contractor Services Contract
Post-Bid
Maitland, FL

Kaye Street Re-Pump Station Building Expansion
Addition
Post-Bid
West Palm Beach, FL

DLTWTF Master Plan Improvements Design Build
Results
$19,000,000 est. value
Tampa, FL

Pump Station Package 23 Improvements
Results
Less than $2,116,000 est. value
Orlando, FL 32801

Tierra Verde Lift Station
New Construction
Construction
Tierra Verde, FL 33715

City of Cape Coral Fire Station #2
New Construction - 10,559 SF
Construction
Fort Myers, FL 33990

Southwest Wastewater Service Area Master Pump Station
New Construction
Bidding
$1,500,000 to $2,000,000 est. value
Okeechobee, FL 34974

City Of Lynn Haven Push Button Maintenance, Repair and Minor Construction Contract
Post-Bid
Lynn Haven, FL 32444

Intermediate Pump Station Improvements
Results
$457,300 est. value
Cape Canaveral, FL 32920

Mid-County Master Lift Station Replacement
Construction
Dunedin, FL 34698

Rivertown Settlement Parcel 29 "Public Utilities" JEA Sewer Force Main and Lift Station Improvement
New Construction
Bidding
Jacksonville, FL

Last Updated 11/11/2021 06:47 AM
Project Title

Lift Stations BU-6 and BB-1 Rehabilitation

Physical Address View project details and contacts
City, State (County) Palm Coast, FL 32137   (Flagler County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of the demolition and rehabilitation of two (2) existing sanitary sewer pump stations, BB-1 and BU-6. The work includes replacing the pumps, piping, valves, electrical and controls for both pump stations. A new sanitary gravity sewer main will be installed at BB-1 on Florida Park Drive, extending approximately 81 feet, ending at Farraday Lane.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents