Similar Projects
Add-Alter Security Forces Squadron Facility Building 52
Renovation, Addition - 10,983 SF
Post-Bid
$1,000,000 to $5,000,000 est. value
McConnell AFB, KS

Fort Riley Building 404
Renovation
Post-Bid
Fort Riley, KS 66442

Medical and Communication Building 2000 Repairs at Forbes Field
Renovation
Design
$1,000,000 to $5,000,000 est. value
Topeka, KS

Roadwork, Road Repair, Maintenance and Construction MATOC
New Construction, Term Contract
Results
Kanopolis, KS - Blue Springs, Saint Charles, MO

Roadwork, Road Repair, Maintenance and Construction MATOC
New Construction, Term Contract
Results
Kanopolis, KS - Blue Springs, Saint Charles, MO

Roadwork, Road Repair, Maintenance and Construction MATOC
New Construction, Term Contract
Results
Kanopolis, KS - Blue Springs, Saint Charles, MO

Roadwork, Road Repair, Maintenance and Construction MATOC
New Construction, Term Contract
Results
Kanopolis, KS - Blue Springs, Saint Charles, MO

Roadwork, Road Repair, Maintenance and Construction MATOC
New Construction, Term Contract
Results
Kanopolis, KS - Blue Springs, Saint Charles, MO

Building #77 Remodel Latrines & Add Room
Renovation
Design
Fort Leavenworth, KS

Reported 12/07/2021 12:00 AM
Project Title

Fy22 Mcconnell Afb - Multiple Award Construction Contract (Macc)

Physical Address View project details and contacts
City, State (County) McConnell AFB, KS 67221   (Sedgwick County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $2,000 to $10,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of the HVAC and DDC system within building 852 along with replacement of the lighting and interior electrical power devices utilizing the building’s existing electrical wiring and circuit infrastructure. Selected architectural and interior finish repairs and upgrades in the training rooms and offices are included as well as a limited number of exterior building repairs (window, doors, old signage adhesive removal). Also, the fire sprinkler system shall be replaced with a new designed and constructed system. Finally, telephone conduits/boxes shall be removed and installed in new locations within each training room. The work consists of a wide variety of construction tasks, including design and build; renovation; additions and upgrades; new construction integrating multiple construction trades and disciplines; and repair and replacement of roadways, airfield taxi-ways and runways. Successful awardees shall be capable of providing a full project design from concept or a performance-oriented statement of work. The contractor shall provide all materials, labor, equipment, tools, transportation and ancillary items necessary to complete each project from conception to completion.

Details

Military Facility, Renovation.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents