Similar Projects
Sanitary Sewer Rehabilitation - Barry Rose Service Area (BR-04) - WW2301 - City of Pearland
Infrastructure
Conception
Less than $3,800,000 est. value
Pearland, TX

Street Reconstruction - Sherwood - TR2302 - City of Pearland
Infrastructure
Conception
$4,300,000 est. value
Pearland, TX

Mountain of Fire & Miracles Ministries Guesthouse
New Construction, Infrastructure - 19,508 SF
Design
$1,000,000 CJ est. value
Houston, TX 77075

The Landing at Pearland Clubhouse and Amenities
New Construction, Infrastructure - 4,767 SF
Design
$1,000,000 est. value
Brookside Village, TX 77581

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Construction of Beechwood Chemical Building
New Construction, Infrastructure
Post-Bid
$130,000 CJ est. value
Lake Jackson, TX 77566

Construction of Beechwood Chemical Building
New Construction, Infrastructure
Post-Bid
$130,000 CJ est. value
Lake Jackson, TX 77566

Manvel Town Center Water Line Interconnect
Results
Manvel, TX 77578

Brazoria Paving Parking Lot
Results
$45,000 to $60,000 est. value
Freeport, TX 77541

SH 36 - Widen Road - Add Lanes
Infrastructure
Construction
$113,599,269 CJ est. value
Damon, TX 77430

SH 36 - Widen Road - Add Lanes
Infrastructure
Construction
$113,599,269 CJ est. value
Damon, TX 77430

Buffalo Wild Wings - 9005 Broadway Street - Pearland, TX
Renovation, Infrastructure - 6,500 SF
Pending Verification
$100,000 CJ est. value
Pearland, TX 77584

Lake Jackson Apartments Renovation
Renovation, Infrastructure
Pending Verification
$8,000,000 CJ est. value
Lake Jackson, TX 77566

Brazoria County MUD 31 Phase One Amenity Improvements
New Construction, Alteration - 47,000 SF
Design
$510,000 est. value
Iowa Colony, TX

Last Updated 12/21/2022 02:35 AM
Project Title

Durant Street Storm Sewer and Pavement Improvements Phase 1 - DR2101 - City of Alvin

Physical Address View project details and contacts
City, State (County) Alvin, TX 77511   (Brazoria County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2025
Bids Due View project details and contacts
Estimated Value $1,800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the design and construction of the first of a two phase project to add a storm sewer system, concrete curb and gutter pavement and a sidewalk along Durant Street. This is the sixth of several drainage improvement projects that were recommended in the M-1 Ditch Watershed Study that was completed in January 2011 by Dannenbaum Engineering. Project location: Durant Street from South Street to just north of Iwo Street. As of December 21, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents