Last Updated | 05/05/2023 11:31 PM |
Project Title | Gymnasium Locker Room HVAC Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | Turlock, CA 95382 (Stanislaus County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,000,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work includes modifications to the mechanical systems and controls of the campus Gymnasium/Fieldhouse building, as delineated on the project drawing set. Demolition includes decommissioning and removal of the existing dx and HHW air moving equipment, exhaust fans, and portions of ductwork. New work includes three new chilled/heating water air handlers, zone level terminal boxes with HHW reheat, exhaust fans, a new exterior mechanical yard, additions to the chilled water and heating water distribution, & all associated controls. The Trustees of the California State University will receive sealed bid proposals in the Corporation Yard Building, Room CY600L(Building 4 on Campus Map), at the above address, for furnishing all labor and materials for construction of the above-named Project, Project Number 23-413, for the California State University, Stanislaus The Trustees require the successful bidder to achieve three percent (3%) DVBE participation in contracting construction projects as established in the bidding documents, and bidders shall identify the DVBEs to be used to satisfy this requirement in their bids The engineer for the project is Nexus Engineering, 1400 Lone Palm Avenue Suite A, Modesto, CA 95351; Travis Haverman, Principal Engineer; telephone: 209-572-7399. Engineer's construction estimate is $2,000,000. Bid Bond BID BOND 10.00% PAYMENT BOND 100.00% PERFORMANCE BOND 100.00% Plans and specifications may be obtained after February 14, 2023 and after the required non-refundable payment of $160.00 per physical set or $75.00 per digital set has been made Direct All Technical Questions to: Eddie Magana, Facilities ChiefEngineer California State University, Stanislaus One University Circle Turlock, CA 95382 Ph: (209) 664-3218 or emaganal4@csustan.edu Completion- The time period for completion of the base bid of the project shall be 388 calendar days this project consists of the replacement of the existing hvac at the gymnasium building locker rooms & surrounding areas as shown on plans. modifications include removing the existing attic mounted fan/coil equipment, exhaust fans, and rooftop mounted equipment, and providing three new air handlers to feed the same areas, with modifications to the ductwork, heating water, and chilled water distribution as required. new controls shall connect to the campus existing automated logic (alc) system for monitoring and operation of the new hvac equipment. necessary modifications to existing structural and electrical systems shall be provided according to the drawings. note the following bid criteria: base bid - includes air handler ah-8 and all associated work. add alternate 1 - add air handler ah-7 and all associated work as noted on drawings. add alternate 2 - add air handler ah-6 and all associated work as noted on drawings. deduct alternate 1 - substitute chainlink for cmu enclosure at ah-8 as noted on drawings. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |