Similar Projects
Sand Silo Air Filter Replacement
Renovation
Sub-Bidding
$100,000 CJ est. value
Los Angeles, CA 90065

HVAC Installation and Energy Infrastructure
Alteration
Post-Bid
Union City, CA

Highland Hospital Koret Building Exhaust Fan and Waterproofing
Alteration
Post-Bid
$1,900,000 est. value
Oakland, CA

Hoover High School Gym, Locker Room, and Music Building HVAC Equipment Replacements
Alteration
Results
$880,000 est. value
Fresno, CA 93722

Henry Robinson Multi-Purpose Center HVAC Replacement
Renovation
Results
$768,600 CJ est. value
Oakland, CA 94612

CHP Central Division Area office - HVAC Maintenance Services
Alteration
Post-Bid
Fresno, CA 93722

Ewing and Turner Elementary Schools Unit Ventilation EMS and Central Plant Equipment Replacement
Alteration
Results
$1,469,000 est. value
Fresno, CA 93727

HVAC A-E and Construction Management Services
Renovation, Term Contract
Post-Bid
Less than $65,000,000 est. value
Livermore, CA 94550

Metropolitan Headquarters Building 2nd Floor Tenant Improvements
Alteration
Results
$210,000 to $250,000 est. value
Los Angeles, CA 90012

District Wide Roofing and HVAC Replacement Project Package Five
Alteration
Post-Bid
Pleasanton, CA 94566

Harvest Park Middle School Gym Boilers Replacements
Alteration
Results
Pleasanton, CA 94566

Regular and On-Call Heating, Ventilation, and Air Conditioning (HVAC) Services
Alteration
Post-Bid
Livermore, Martinez, Oakland, Oakley, Redwood City, Richmond, San Jose, San Pablo, Vallejo, CA 94603

HVAC Replacement Juvenile Center
Alteration
Results
Hanford, CA 93230

HVAC Services at Northern California DWR Facilities
Alteration
Post-Bid
Byron, CA 94514

HVAC Repairs
Alteration
Results
Oakland, CA 94612

Last Updated 05/05/2023 11:31 PM
Project Title

Gymnasium Locker Room HVAC Replacement Project

Physical Address View project details and contacts
City, State (County) Turlock, CA 95382   (Stanislaus County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes modifications to the mechanical systems and controls of the campus Gymnasium/Fieldhouse building, as delineated on the project drawing set. Demolition includes decommissioning and removal of the existing dx and HHW air moving equipment, exhaust fans, and portions of ductwork. New work includes three new chilled/heating water air handlers, zone level terminal boxes with HHW reheat, exhaust fans, a new exterior mechanical yard, additions to the chilled water and heating water distribution, & all associated controls. The Trustees of the California State University will receive sealed bid proposals in the Corporation Yard Building, Room CY600L(Building 4 on Campus Map), at the above address, for furnishing all labor and materials for construction of the above-named Project, Project Number 23-413, for the California State University, Stanislaus The Trustees require the successful bidder to achieve three percent (3%) DVBE participation in contracting construction projects as established in the bidding documents, and bidders shall identify the DVBEs to be used to satisfy this requirement in their bids The engineer for the project is Nexus Engineering, 1400 Lone Palm Avenue Suite A, Modesto, CA 95351; Travis Haverman, Principal Engineer; telephone: 209-572-7399. Engineer's construction estimate is $2,000,000. Bid Bond BID BOND 10.00% PAYMENT BOND 100.00% PERFORMANCE BOND 100.00% Plans and specifications may be obtained after February 14, 2023 and after the required non-refundable payment of $160.00 per physical set or $75.00 per digital set has been made Direct All Technical Questions to: Eddie Magana, Facilities ChiefEngineer California State University, Stanislaus One University Circle Turlock, CA 95382 Ph: (209) 664-3218 or emaganal4@csustan.edu Completion- The time period for completion of the base bid of the project shall be 388 calendar days this project consists of the replacement of the existing hvac at the gymnasium building locker rooms & surrounding areas as shown on plans. modifications include removing the existing attic mounted fan/coil equipment, exhaust fans, and rooftop mounted equipment, and providing three new air handlers to feed the same areas, with modifications to the ductwork, heating water, and chilled water distribution as required. new controls shall connect to the campus existing automated logic (alc) system for monitoring and operation of the new hvac equipment. necessary modifications to existing structural and electrical systems shall be provided according to the drawings. note the following bid criteria: base bid - includes air handler ah-8 and all associated work. add alternate 1 - add air handler ah-7 and all associated work as noted on drawings. add alternate 2 - add air handler ah-6 and all associated work as noted on drawings. deduct alternate 1 - substitute chainlink for cmu enclosure at ah-8 as noted on drawings.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents