Similar Projects
Underground Storage Tanks at WPAFB, OH
Post-Bid
$10,000,000 to $25,000,000 est. value
Dayton, OH 45433

Mill Creek Metroparks Gasoline and Fuel Oil
Post-Bid
Canfield, OH

East Harbour State Park Marina Fuel System Improvement
Results
Less than $221,700 est. value
Lakeside Marblehead, OH

East Harbor State Park Marina Fuel System Improvement
Results
Less than $309,750 est. value
Lakeside, Marblehead, OH 43440

Chemical Inventory
Post-Bid
Bowling Green, OH 43402

DPU/DOSD/Surv Lab/ MB Tank
Results
Columbus, OH

Tappan Lake Marina Fuel System Improvements
Results
New Philadelphia, OH 44663

Hueston Woods Marina
Results
Less than $100,000 est. value
College Corner, OH 45003

Argon Tank - Furnish and Install
Results
Columbus, OH

Hamilton Enterprise Park (HEP) Gas Main Loop
Results
Hamilton, OH

Polyethylene and Fiberglass Stationary Liquid Storage Tanks
Term Contract
Results

SSO 700 STF Disinfection Improvements
Results
Less than $4,000,000 est. value
Cincinnati, OH

Gas Regulator SCADA Conduit Project
Results
Hamilton, OH 45011

Compressed Natural Gas (CNG) Fueling System Services
Results
Less than $546,400 est. value
Columbus, OH 43215

Above Ground Fuel Storage Tank/ Equipment
Results
Riverside, OH 45204

Last Updated 03/05/2020 10:25 AM
Project Title

FCI ELKTON - Phase 2 - Remove UST

Physical Address View project details and contacts
City, State (County) Lisbon, OH   (Columbiana County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 2 – Remove UST The contractor shall provide all labor, materials, equipment for the removal of seven USTs along with all related piping, fuel dispensers and accessories at FCI Elkton. The Statement of Work/Specifications attachment included with the solicitation will provide complete requirements for the project. The solicitation will be posted at a later date.

Details

Division 02 - Existing Conditions, Subsurface Investigation, Underground Storage Tank Removal.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents