Similar Projects
City Hall Offices & Plaza
New Construction
Design
Kenosha, WI 53140

Interurban Trailhead - Site Work
Bidding
$45,000 est. value
Watertown, WI 53094

Lions and Biwer Park Improvements
Bidding
New Berlin, WI

Don Almquist Playground Reconstruction
Post-Bid
Greenfield, WI 53220

Playground Equipment for 2 (Two) City Parks
Post-Bid
Less than $48,000 est. value
Green Bay, WI 54302

Playground Replacements at Sunny Valley and Hunter's Ridge Parks
Results
Less than $90,000 est. value
Sun Prairie, WI 53590

East Park Commerce Center - Phase 1
Results
Stevens Point, WI 54481

Haribo Candy Manufacturing Plant
New Construction - 575,266 SF
Construction
$300,000,000 est. value
Kenosha, WI 53142

The Boneyard
New Construction - 2,400 SF
Construction
$500,000 to $1,000,000 CJ est. value
Madison, WI

Apostle Islands Area Campground Expansion
New Construction
Pending Verification
Bayfield, Red Cliff, WI

Timber Bluffs Acres
New Construction
Pending Verification
Eau Claire, WI 54701

Lions Park Playground
Bidding
New Berlin, WI

Timeless Timber Site Commercial Redevelopment
Post-Bid
Ashland, WI 54806

Burton Park Playground Surfacing
Results
$75,000 est. value
Hudson, WI 54016

13 Lot Single Family Sub Division
New Construction
Construction
Mequon, WI 53097

Reported 02/19/2021 12:00 AM
Project Title

Veterans Memorial Field South Softball Field Site Redevelopment

Physical Address View project details and contacts
City, State (County) Portage, WI 53901   (Columbia County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids.
Project Status Bidding, Construction Completion Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Consultant
Owner View project details and contacts
Architect View project details and contacts
Description

CONTRACT “A” – General Site Construction of south softball field. 1.Site improvement work for the south softball field with work including, but not limited to, mobilization, erosion control, demolition, earthwork, import and place fill, dense graded base, exterior concrete flatwork, storm sewer, infield mix, placing topsoil, seeding, natural turf maintenance, fencing, athletic field equipment, and irrigation system 2. Connect to existing conduit and furnish and install conduit to the owner furnished scoreboard for the south softball field. Install owner furnished scoreboard. Furnish and install power to scoreboard and all connections shown. 3. All necessary work to complete the proposed contract as represented in the construction documents shall be included in the CONTRACTOR’S bid. C In lieu of “Import and Place Earth Fill” listed in General Site Construction base bid, “Place Earth Fill Provided, Loaded, and Hauled by OWNER.” 2. All necessary work to complete the proposed contract as represented in the construction documents shall be included in the CONTRACTOR’S bid. Contract “A, Alternate A-2” – Electrical Conduit Extension 1. From the previous contracts cut off point to the new conduit cut off point, extend all conduit stubs to the future baseball field (NW corner of site) and future concession stand. From the previous contracts conduit cut off point, extend all conduit stubs to the future Musco concrete base locations for the South field. From the previous contracts conduit cut off point, extend all conduit stubs to field receptacles at dugout and backstop locations for the South field. Furnish and install all associated site conduit. 2. All necessary work to complete the proposed contract as represented in the construction documents shall be included in the CONTRACTOR’S bid. CONTRACT “A, Alternate A-3” – Unscreened Topsoil in Lieu of Screen Topsoil 1. In lieu of screened topsoil, place unscreened topsoil if the salvaged topsoil meets the specifications and is approved by the Owner. 2. All necessary work to complete the proposed contract as represented in the construction documents shall be included in the CONTRACTOR’S bid.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents