Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Replace T2a Transformer
Post-Bid
Colorado Springs, CO 80914

Emergency Generator
Post-Bid
Colorado Springs, CO

UPS Battery Replacement and Installation
Results
Fort Carson, CO 80913

Transformer (750KVA) Pad Mount Replacement and Installation
Results
Colorado Springs, CO 80914

Weatherization Materials - Energy Resource Center
Term Contract, Alteration
Construction
Colorado Springs, CO 80903

Airport Carport Solar Project
Post-Bid
Colorado Springs, CO 80947

Martin Drake Power Plant Temporary Natural Gas Generation
Results
CO

Chestnut Security Lighting Upgrade
Alteration
Post-Bid
$215,000 est. value
Colorado Springs, CO 80907

Electric Emergency Response / Reconstruction Services
Results
Colorado Springs, CO 80947

On-Call Emergency Generator Service
Alteration
Post-Bid
Colorado Springs, CO 80910

SECC Switchgear Replacement
Results
Colorado Springs, CO 80907

Led Light Source Lamps
Alteration
Post-Bid
Colorado Springs, CO

Centennial Hall Lighting Upgrade
Results
Colorado Springs, CO 80903

Switches and Uninterruptable Power Supply
Alteration
Post-Bid
Colorado Springs, CO

Reported 01/29/2022 12:00 AM
Project Title

CMSFS Refurbish Diesel Generators

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80906   (El Paso County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of rebuilding and retrofitting six (6) diesel engines and generators to a zero hour standard. Project will also include purchasing, installing, and commissioning all new controls, panels, PLC’s and wiring/sensors associated with modernizing the engines and generators to current industry standards. The project will be completed in six phases, refurbishing one generator per phase. During a given phase, all generators not being refurbished during that phase, must remain fully operational.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents