Similar Projects
Elizabeth M Anderson Hall and Sunie S. Green Hall HVAC Replacement
Post-Bid
$1,199,000 est. value
Wilberforce, OH

Installation of Ultraviolet Disinfection Equipment in HVAC Systems
Alteration
Post-Bid
Lancaster, OH 43130

Replace Fan Coil Units Building 7 Sinclair Community College
Results
$200,000 est. value
Dayton, OH

Nagel MS Cooling Tower Replacement
Results
Cincinnati, OH

Design-Build Services
Infrastructure, Alteration
Post-Bid
Vandalia, OH

Scioto Ridge Elementary School Chiller Replacement
Results
Powell, OH 43065

Chiller Maintenance
Term Contract
Post-Bid
OH

Mechanical (HVAC) Systems Maintenance and Service
Results
$917,852 est. value
Miamisburg, OH

T&M Contract Plumbing - HVAC - Refrigeration
Term Contract, Alteration
Post-Bid
Akron, OH

Industrial Air Quality Testing Services
Results
Bratenahl, Cleveland, OH 44199

CSC-21501 Maintenance of HVAC, Plumbing and Emergency Power Supply (EPS) Systems
Term Contract
Post-Bid
Whitehall, OH 43213

Air Handler Maintenance
Results
OH

All-Fiber Insulation Machines
Alteration
Post-Bid
Ashtabula, OH

Air Handler Maintenance
Results
OH

Ridges Building 33 Deaerator Replacement 2021
Alteration
Post-Bid
$530,000 est. value
Athens, OH 45701

Last Updated 12/08/2022 01:05 PM
Project Title

Hot Water Heat Boiler Replacement - Tecumseh Middle School

Physical Address View project details and contacts
City, State (County) New Carlisle, OH 45344   (Clark County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE: Replace (2) Unilux ZF 500W boilers with new Unilux ZF 500W-LB boilers with FIRE EYE PPC4000 Parallel Positioning Controls OR equivalent. -Drain boiler back to circulator pumps -Disconnect all utilities and fresh air duct -Disconnect flue -Disconnect boiler gas train and gas piping -Demo existing hot water supply and return piping from boilers -Remove existing boilers load onto truck and dispose -Off load new Unilux boilers with crane, skate into place -Install new gas train -Reconnect water supply and returns lines -Fill boiler and factory startup All bids must include prevailing wages. Contractor assumes all cost with rigging to transport units.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents