Similar Projects
Salgado Community Center Roof Improvements
Term Contract
Bidding
$500,000 est. value
Santa Ana, CA 92703

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

HVAC Upgrade at the District Operations Center
Alteration
Results
Santa Ana, CA 92799

Fullerton College Swing Space
Renovation, Alteration
Results
$420,000 est. value
Fullerton, CA 92832

CHP Capistrano Roof Maintenance
Renovation, Alteration
Post-Bid
San Juan Capistrano, CA 92675

Golden West College LRC Duct Work Replacement
Renovation, Alteration
Results
$400,000 est. value
Huntington Beach, CA 92647

CHP Santa Ana Roof Maintenance
Renovation, Alteration
Post-Bid
Santa Ana, CA 92705

Heating, Ventilation and Air-Conditioning (HVAC) Preventative Maintenance and Repair Services
Alteration
Results
CA

CHP Westminster Roof Maintenance
Renovation, Alteration
Post-Bid
Westminster, CA 92683

Roof Replacement Project at Robinson Elementary School
Alteration
Results
Trabuco Canyon, CA 92679

Pollak Library South HVAC Duct Cleaning
Alteration
Post-Bid
Fullerton, CA 92831

Gym Roof Replacement Project at Laguna Hills High School
Alteration
Results
Laguna Hills, CA 92653

Heating, Ventilation, and Air Conditioning (HVAC) Duct System Maintenance Services (Fullerton DMV Field Office)
Term Contract, Alteration
Post-Bid
$15,000 est. value
Fullerton, CA 92832

Various Facilities HVAC Replacement
Alteration
Results
$138,000 est. value
Costa Mesa, CA 92626

Reported 02/16/2022 12:00 AM
Project Title

Police Headquarters Lobby Roof and HVAC Rehabilitation

Physical Address View project details and contacts
City, State (County) Orange, CA 92867   (Orange County)
Category(s) Single Trades
Sub-Category(s) HVAC, Roofing
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Description: The work to be done includes the removal of the existing lobby skylight roof system and installation of a new standing seam metal roof, procurement and establishment of a temporary office facility to house the lobby police services during construction, removal of the existing building HVAC chiller, air handlers and VAV boxes and replacement with new. Installation of new photovoltaic panels on the existing roof.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents