Similar Projects
Reco Avenue Bank Stabilization
Infrastructure
Bidding
$301,000 est. value
Crestwood, MO 63126

Brentwood Park Storm Sewer and Creek Bank Project
Infrastructure
Bidding
$200,000 est. value
Brentwood, MO

Deer Creek Greenway - Deer Creek Park Streambank Stabilization
Infrastructure
Post-Bid
Maplewood, MO

Mississippi Greenway - LKS Flood Repairs
Infrastructure
Post-Bid

Deer Creek Flood Mitigation Phase 2
Results
Brentwood, MO

West Hangar Drainage Improvements
Results
Chesterfield, MO 63005

City Hall Drainage Improvements
Infrastructure
Bidding
$200,000 est. value
Kirkwood, MO 63122

Repair and Rehabilitation of the Ruth Park Driving Range
Infrastructure
Post-Bid
University City, MO

Paddock Creek Improved Channel Repair
Results
$597,000 est. value
Chesterfield, MO

Sinkholes Remediation
Infrastructure
Post-Bid
$250,000 to $500,000 est. value
Bella Villa, MO 63125

2021 Bank Stabilization & Navigation Project (Bsnp) Structures Repair
Term Contract
Results

Beverly Avenue and Halcyon Drive Improvements
Infrastructure
Post-Bid
Glendale, MO 63122

Stream Bank Restoration Phase II
Infrastructure, Alteration
Results
Ballwin, MO 63021

Fee Fee Road Ballfields Culvert Replacement
Infrastructure
Post-Bid
Maryland Heights, MO

Aubuchon Road Culvert Repair
Infrastructure
Results
MO

Last Updated 04/15/2022 04:27 PM
Project Title

Laurel Lake Estate Pond

Physical Address View project details and contacts
City, State (County) Town and Country, MO 63131   (Saint Louis County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $750,940
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work includes removal of existing concrete dam and placement of permanent erosion control items, grading, drainage pipes, plantings, and other incidental items to recreate a natural channel.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents