Similar Projects
Grading, Drainage, and Paving
Infrastructure
Bidding
$2,000,000 est. value
Monroe, NC

Parkwood Middle School-Parking Improvements
Infrastructure
Post-Bid
Monroe, NC 28112

Downtown Pedestrian Improvement Phase I Project
Infrastructure
Post-Bid
Waxhaw, NC

Miscellaneous Concrete and Drainage Items Repair and Construction
Infrastructure, Alteration
Results

Polypropylene Pipe
Results

South Church Street Stormwater Improvements
Infrastructure
Post-Bid
Waxhaw, NC 28173

Corrugated Aluminized Pipe
Infrastructure
Results
Monroe, NC 28110

First Avenue Roadway and Drainage Improvements
Post-Bid
Indian Trail, NC 28079

Roadway Sweeping, Large Debris Removal and Storm Drain Cleaning on Various Interstate and Primary Roads
Infrastructure
Results

Mcdonald Street Parking and Sidewalk
Infrastructure
Post-Bid
Waxhaw, NC 28173

Construction of a Roundabout at the Intersection of NC 200, NC 522 and Parkwood School Road
Infrastructure
Results
Monroe, NC 28110

Monroe Science Center Parking Lot Master Plan
Infrastructure
Post-Bid
$400,000 est. value
Monroe, NC 28112

ADA and Drainage Improvements at Indian Trail Elementary School
Infrastructure
Results
Indian Trail, NC 28079

Construction of Concrete Curb Ramps and Retrofitting Existing Ramps (Contract B)
Infrastructure
Results

Construction of Concrete Curb Ramps and Retrofitting Existing Ramps (Contract B)
Infrastructure
Results
$400,000 est. value

Reported 06/25/2022 12:00 AM
Project Title

Stallings Greenway Project

Physical Address View project details and contacts
City, State (County) Matthews, NC 28106   (Union County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $110,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Stallings Greenway project includes the installation of approximately 1900 lineaaen way trail along the North Fork Crooked Ceek tributary. The 10' wide asphalt trail incorporates several culvert crossings. The scope of work also includes a new electrical service and installation of a HAWK signalized pedestrian crossing at Steven Mill Rd. along with any required traffic control. Landscape elements include landscaping, fencing, signage and erosion control measures. The Stallings Greenway project includes the installation of approximately 1900 linear ft. of greenway trail along the North Fork Crooked Creek tributary. The 10' wide asphalt trail incorporates several culvert crossings. The scope of work also includes a new electrical service and installation of a HAWK signalized pedestrian crossing at Steven Mill Rd. along with any required traffic control. Landscape elements include landscaping, fencing, signage and erosion control measures.

Details

Division 01 - General Requirements, Temporary Barriers and Enclosures, Temporary Fencing.
Division 10 - Specialties, Signage.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Transportation Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents